BT模式在工程实施阶段的管理模式和运行机制设计研究
[Abstract]:With the rapid development of China's economy, the demand for infrastructure projects and public utility projects has increased. However, infrastructure projects and public utility projects are usually large in scale and large in demand for funds. Far more than the financial input capacity of local governments, which forces the government to change its traditional concept, actively look for new forms of investment and financing, and absorb a large number of rich social funds. The BT model is developed under such a background. As a new type of project investment and financing model, it can not only effectively alleviate the financial pressure of local governments, but also change the management functions of the government, introducing the latest and most advanced construction techniques and management methods. Contribute to infrastructure works and public utility projects. At present, the development of BT mode in foreign countries has become mature, but in our country, it is still in the stage of groping and research, lacking the corresponding laws, regulations and systematic norms, and there are still many problems in practical operation. Continue to grope in practice, summarize and perfect. In order to study the management mode and operation mechanism of BT mode in the stage of project implementation, this paper studies and refers to the theory and practice of BT mode at home and abroad. The following studies are carried out: firstly, the operating background of the BT project of Gaojia Garden Project (the general situation of the project, the characteristics of the project) and several outstanding problems existing in the operation of the current BT model in China are introduced. Four common management modes in the process of BT mode; To establish a relatively solid theoretical knowledge base: then analyzed the relevant subjects in the BT model, put forward some solutions to the problems existing in the current BT mode, and put forward the operation mechanism of BT mode (cost control mechanism). The constraint mechanism, the risk management mechanism, the supervision and control mechanism, the communication coordination mechanism and the incentive mechanism are described and analyzed in detail. Finally, combining with the example of BT project of Gaojia Garden Project, the paper discusses the related problems, including the project management mode, the main body analysis of the project, the control of "four goals", the achievement and the defect analysis. The purpose of the study on the management mode and operation mechanism of the BT mode in the implementation stage is to guide the BT mode to be better applied to the infrastructure engineering and public utility project construction, and to provide more reasonable, standardized and effective operation guidance. Reduce the problems and difficulties that may arise in the operation of BT projects. This paper studies the management mode and operation mechanism of BT mode in the implementation stage, urges government departments to establish a sound legal system of BT model, and standardizes the actual project operation. It is of great theoretical and practical significance to further promote the reform of investment and financing system and the innovation of construction project management mode in China.
【学位授予单位】:重庆交通大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:TU71
【相似文献】
相关期刊论文 前10条
1 牛淑芳;;试论工程实施阶段的造价管理[J];科技资讯;2007年34期
2 杨芸;;造价管理在公路工程实施阶段中的运用[J];中国高新技术企业;2008年15期
3 许秀侠;;工程实施阶段的造价管理[J];内蒙古科技与经济;2008年18期
4 邰旭东;;论工程实施阶段的投资控制管理[J];改革与开放;2012年18期
5 张建新;;电力工程实施阶段的造价管理研究[J];经营管理者;2013年30期
6 侯长虹;;地铁工程实施阶段的造价管理[J];建材技术与应用;2007年04期
7 张丽霞;;浅谈项目工程实施阶段投资目标控制——以某故居修复工程的成功造价管理实践为例[J];重庆建筑;2007年07期
8 丁海英;;浅述工程实施阶段的造价管理[J];科技创新导报;2008年19期
9 张发秀;;论公路工程实施阶段项目风险的控制[J];科技信息;2010年18期
10 王作明;;论房地产项目工程实施阶段的质量控制[J];科技风;2011年22期
相关会议论文 前2条
1 陈晓倩;张艳丽;;建设工程实施阶段的造价管理与控制[A];土木建筑学术文库(第14卷)[C];2010年
2 张晓娟;;浅析建设项目工程实施阶段的造价投资控制[A];2013年4月建筑科技与管理学术交流会论文集[C];2013年
相关重要报纸文章 前3条
1 记者 王元晖 通讯员 梁家树;新农村建设步入工程实施阶段[N];厦门日报;2010年
2 记者 莫延钦;截污主干管网工程要如期完工[N];东莞日报;2009年
3 吴毅邋高峰;淮安首座水上服务区工程启动[N];中国水运报;2008年
相关硕士学位论文 前4条
1 刘冰;电力建设工程实施阶段过程控制研究[D];大连理工大学;2002年
2 邹晓东;建设工程实施阶段造价控制关键环节研究[D];四川大学;2006年
3 乌明丽;建筑工程实施阶段成本预测和控制[D];江西理工大学;2009年
4 谭诗维;BT模式在工程实施阶段的管理模式和运行机制设计研究[D];重庆交通大学;2013年
,本文编号:2396734
本文链接:https://www.wllwen.com/kejilunwen/sgjslw/2396734.html