萨中开发区周期交替注聚技术研究
[Abstract]:Since the first class of reservoir polymer flooding in Sazhong Development Zone was put into industrial application in 1996, it has gone through the research and popularization process of middle score, high score to super high score and from ordinary concentration to high concentration, which makes the range of improving oil recovery increasing. However, from the point of view of the production situation of the reservoir in the process of polymer injection, the production condition of the single well with great permeability difference and the layer with relatively poor reservoir properties is not ideal. In recent years, the relevant research units have carried out in-depth research on alternating injection, and it is concluded that alternating injection can improve reservoir recovery and save polymer dry powder at the same time. According to the target of polymer flooding "520" and the requirements of "four best" in Daqing Oilfield Co., Ltd., the injection station No. 2 of Xidong Block, Nanyi District, is selected as the experimental area in Sazhong Development Zone to carry out different molecular weights. In order to explore a new way to further improve oil recovery and save dry powder, different concentrations of cyclic alternating injection test were used to explore a new way to further improve oil recovery and save dry powder. Based on the fine description of the reservoir in the experimental area, this paper makes a systematic analysis of the reservoir characteristics, reserve distribution, production status of the present well pattern and the remaining oil potential of the No. 2 injection station in the Xidong Block of the South 1 area. Through cyclic alternating polymer injection of different molecular weight polymers, combined with fracturing, split injection, profile control and other measures, the injection ability and production degree of thin difference reservoir are improved, the polymer is used efficiently, and the cost of polymer is reduced. Further improve the development effect of the block. In the experimental stage, the oil recovery is increased by 12% and the cost of chemical agent is saved by 21.7%. The test results can be applied to 125 m well distance polymer flooding industrial block of the main reservoir. Without affecting the final improvement of oil recovery, the polymer cost can be saved, the cost can be reduced, and the economic benefit can be maximized. It has guiding and reference significance for the research and application of small well spacing in the main reservoir and alternating injection of polymer flooding in the second type of reservoir.
【学位授予单位】:东北石油大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TE357.46
【相似文献】
相关期刊论文 前10条
1 佘庆东;返层注聚后两驱产量衔接方法研究[J];国外油田工程;2004年02期
2 蒋福江;曾红梅;;三类油层周期分质注聚的做法与效果分析[J];大庆石油地质与开发;2007年01期
3 徐海乐;罗云凤;;注聚先导区短命井原因分析及治理对策[J];中国石油和化工标准与质量;2012年02期
4 王鑫;;分质分压工艺在三类油层注聚开发中的应用[J];科技与企业;2012年14期
5 王彦梅;;同层注聚、注水引发的平面矛盾[J];内蒙古石油化工;2012年17期
6 刘淑芹;;提高注聚泵保粘率的设计技术研究[J];辽宁科技学院学报;2013年02期
7 薛永宏;;注聚参数优化研究[J];化工管理;2014年05期
8 孟令尊;;注聚泵永磁直驱节能技术现场应用研究[J];石油石化节能;2014年03期
9 穆志刚;;注聚转水驱后管杆损坏原因及对策[J];科技致富向导;2009年02期
10 徐志清,吴淑蓉,付剑,朱德全,隆新跃;优化注聚参数提高注聚效果[J];油气田地面工程;2002年04期
相关会议论文 前2条
1 张纪双;李振华;苑金宝;陈桂香;;孤岛油田注聚区低产能井挖潜技术[A];三次采油技术研讨会论文集[C];2003年
2 柴德民;辛爱渊;高学生;唐洪涛;;胜一区注聚先导区转后续水驱防窜技术应用研究[A];三次采油技术研讨会论文集[C];2003年
相关重要报纸文章 前7条
1 顾永强 唐文芳 胡燕玲;企业员工青睐质疑式互动培训[N];工人日报;2007年
2 郑言;班组“6S”管理引发磁场效应[N];工人日报;2009年
3 闫江斌;董淼;三次采油分层注聚试验成功[N];中国石化报;2002年
4 通讯员 顾永强;低剪切截止调节阀实现注聚泵多井注聚[N];中国石油报;2006年
5 顾永强;胜利油田解决注聚站管线穿孔难题[N];中国工业报;2012年
6 刘佩服邋日报记者 周志刚;采油四厂多措并举促增产[N];大庆日报;2007年
7 顾永强 苏莉 刘玉生;一石二鸟“情绪假”[N];中国安全生产报;2007年
相关博士学位论文 前1条
1 徐赋海;油田注聚后聚电解质复合技术进一步提高采收率研究[D];西南石油大学;2006年
相关硕士学位论文 前4条
1 董官宇;萨中开发区周期交替注聚技术研究[D];东北石油大学;2015年
2 冯玉平;新型注聚装置的研制[D];中国石油大学;2010年
3 高岩涛;注聚泵综合参数测试装置的研制[D];哈尔滨理工大学;2004年
4 燕中庆;孤岛油田二类注聚油藏注采矛盾及治理对策[D];中国地质大学(北京);2008年
,本文编号:2478495
本文链接:https://www.wllwen.com/kejilunwen/shiyounenyuanlunwen/2478495.html