耦合S曲线和贝叶斯网络的水利工程成本-进度仿真分析及应用

发布时间:2018-03-16 19:19

  本文选题:工程仿真 切入点:S曲线 出处:《中国农村水利水电》2017年10期  论文类型:期刊论文


【摘要】:针对工程施工成本优化与进度风险分析问题,提出了耦合S曲线和贝叶斯网络的施工成本-进度仿真分析方法。根据成本-进度S曲线对施工成本进行优化与控制;利用贝叶斯风险分析方法研究小型水利工程因工期短而普遍存在的进度风险问题,通过贝叶斯网络对进度风险的敏感性分析确定关键进度风险因素,为工程施工成本与进度管理提供有力依据。该方法成功应用于某河渠防护工程中,河渠防护工程成本优化及关键进度风险因素的确定为施工成本与进度定量分析提供有效支持。
[Abstract]:In order to solve the problem of engineering construction cost optimization and schedule risk analysis, a method of coupling S curve and Bayesian network is put forward. The construction cost is optimized and controlled according to the cost schedule S curve. Bayesian risk analysis method is used to study the schedule risk of small water conservancy projects because of the short construction period, and the key schedule risk factors are determined by the sensitivity analysis of Bayesian network to schedule risk. This method has been successfully applied to a river canal protection project. The optimization of channel protection project cost and the determination of key schedule risk factors provide effective support for quantitative analysis of construction cost and schedule.
【作者单位】: 天津大学水利工程仿真与安全国家重点实验室;廊坊市水务局;
【分类号】:TV51

【相似文献】

相关期刊论文 前4条

1 王卓甫,杨志勇,杨建基;水利水电工程施工进度风险规定下的投资优化[J];河海大学学报(自然科学版);2000年06期

2 王卓甫,欧阳红祥,李红仙;水利水电施工搭接网络进度风险计算[J];水利学报;2003年01期

3 欧阳斌,王琳,黄敬东;港口工程进度风险分析研究[J];水运工程;2005年01期

4 李果;强茂山;;利用S曲线模型分析水利工程资金流[J];水力发电学报;2011年04期



本文编号:1621300

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/1621300.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户7f474***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com