当前位置:主页 > 科技论文 > 水利工程论文 >

hydro project 的翻译结果

发布时间:2016-12-15 12:40

  本文关键词:《水利水电工程钢闸门设计规范》可靠度初校,由笔耕文化传播整理发布。


 在分类学科中查询

所有学科

水利水电工程

环境科学与资源利用

工业经济

电力工业

自动化技术

地球物理学

计算机软件及计算机应用

公路与水路运输

农业基础科学

 历史查询

 

hydro project     

  • 水利枢纽工程(28)
  •   

         Research on Planning and Evaluation of Water Environment in Xinjiang Hydro Project

         新江水利工程水环境规划设计与评价研究

    短句来源

         Design and Implementation of Graphic Documents in Hydro Project Design Management System

         水利工程设计图档管理系统的设计与实现

    短句来源

         the local water administration department has overlap or similar functions in hydro project planning and demonstrability, the water resources planning, arrangement, dispatching and protection, water-using permission, as well as flood control, so the issues such as illegibility of responsibility, right and interest come into being.

         流域管理机构与地方水行政主管部门在水资源与水利工程的规划,水资源的管理、配置、调度、保护,建设项目水资源论证与取水许可申请,水利工程建设管理以及防洪调度等方面存在着职能交叉和重叠,管理、审批、监督权限不清,责、权、利不对应。 新《水法》确立了流域管理与行政区域管理相结合的水资源管理体制。

    短句来源

         Hydro Project Construction and Management in China

         我国水利工程建设与管理

    短句来源

         Circulation management method for graphic documents in hydro project design and its realization

         水利工程设计图档流转管理方法及实现技术

    短句来源

    更多       

      

         Design and construction of enclosing diversion tunnel in QPQ hydro project

         QPQ水利枢纽工程导流洞封堵设计与施工

         Measures for prevention of silt plug and abrasion in Xiaolangdi Hydro Project

         小浪底水利枢纽工程预防泥沙淤堵和磨蚀的工程措施

    短句来源

         Automation system of the control net of external deformation observation for the Wanjiazai Hydro project

         万家寨水利枢纽外部变形观测控制网自动化系统

    短句来源

         Study on Monolithic Stability of Dam and Foundation of Wudu Hydro Project

         武都水利枢纽工程坝与地基整体稳定性研究

    短句来源

         Dam type optimization for a hydro project by fuzzy optimum model

         应用模糊优选模型优选水利枢纽工程坝型

    短句来源

    更多       

      

         Several problems of the flood control standards on hydro project

         水电工程防洪标准的几个问题——对国标“防洪标准”的商榷

    短句来源

         Calculation of reliability according to the design criteria for steel gate of hydro project

         《水利水电工程钢闸门设计规范》可靠度初校

    短句来源

         On environmental management for construction of large hydro project

         大型水利水电工程建设环境管理初步探讨

    短句来源

         Dynamic visual simulation of hydro project construction based on GIS

         基于GIS的水电工程施工动态可视化仿真方法及其应用

    短句来源

         The Daguangba project is the largest hydro project in Hainan Province.

         大广坝水利水电枢纽是海南省最大的水电工程。

    短句来源

    更多       

      

         Design and construction of enclosing diversion tunnel in QPQ hydro project

         QPQ水利枢纽工程导流洞封堵设计与施工

         Measures for prevention of silt plug and abrasion in Xiaolangdi Hydro Project

         小浪底水利枢纽工程预防泥沙淤堵和磨蚀的工程措施

    短句来源

         Study on Monolithic Stability of Dam and Foundation of Wudu Hydro Project

         武都水利枢纽工程坝与地基整体稳定性研究

    短句来源

         Dam type optimization for a hydro project by fuzzy optimum model

         应用模糊优选模型优选水利枢纽工程坝型

    短句来源

         This article presents some successful practice to control the investment of the Xiaolangdi Hydro Project,which comprises:(1)organizational structure and management functions of investment control system;

         小浪底水利枢纽工程投资控制中有一些成功的实践经验,具体包括:(1)投资控制体系的组织机构及管理职能;

    短句来源

    更多       

     

    查询“hydro project”译词为用户自定义的双语例句
        我想查看译文中含有:的双语例句

    为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。

      hydro project

    Results are presented for a fissured rock mass during the driving of tunnels for the Kousar hydro project (Iran).

          

    The Raging River small hydro project was connected to the grid in May 2002.

          

    The Assynt hydro project is a project which has been spearheaded by John himself.

          

    Tell the member for Nelson-Creston to back off the Cascade heritage hydro project.

          

    Modifications would require that the Hydro Project pipe its return flows under the river and return them to the fish passage entrance.

          

    更多          



    Guanting Reservoir, which is a multipurpose hydro-project mainly used for flood-control and water supply to Beijing, is located on the Yongding River. This river and its tributaries Yang River and Sanggan River are sediment-laden rivers. The sediment yield of the gullied-hilly loess area amounts to 10 kt/km2 or more. The yearly average sediment load at Guanting is 70×106 tons.The storage capacity of the reservoir is 2.27 × 109m3, which consists of two parts-----40% in the main stream and 60%in its...

    Guanting Reservoir, which is a multipurpose hydro-project mainly used for flood-control and water supply to Beijing, is located on the Yongding River. This river and its tributaries Yang River and Sanggan River are sediment-laden rivers. The sediment yield of the gullied-hilly loess area amounts to 10 kt/km2 or more. The yearly average sediment load at Guanting is 70×106 tons.The storage capacity of the reservoir is 2.27 × 109m3, which consists of two parts-----40% in the main stream and 60%in its tributary Guishui River. Since the completion of the dam construction in 1953, the reservoir has been used as a storage basin. Serious defects, such as the rapid loss of storage capacity and the upstream extension of backwater deposition, have been exposed. Now the terminal of the backwater deposition is upstream the confluence of its two tributaries. In this paper the emphases are put on the following problems: the sedimentation process of the sand bar at the river mouth of the Guishui River, its effect on loss of the available storage capacity in the tributary; the upstream extension of backwater deposition and its effect; and the threat of blocking of bottom sluices by sediment. The effect of human acfivity in the basin on incoming water and sediment is discussed.The measures for reducing the siltation in reservoir, the demand for further investigation and research works are also presented.

    本文着重探讨了官厅水库这座在多沙河道上具有分支库区的、水库末端位于两条支流汇合处上游的典型水库淤积问题。该水库运用30年来,泥沙问题突出表现为支流河口形成拦门沙、淤积末端上延和输水洞被淤堵等。文中还讨论了流域人类活动对入库水沙和淤积的影响,并对今后研究方向和治理措施提出建议。

    In conformity with the prevailing financial conditions, a cost analysis of both hydro and thermal projects is made at some length. The economy of a certain hydro project is proved.

    本文针对某大型水电工程,对比火电进行了详细的成本分析计算。论述水电方财务上的优越性,通过华东区一项运煤送电方案的具体比较;论述了送电方案的经济性。

    The planned Three-Gorge Hydro Project (TGHP) is located in The Central Power Network of China (CPNC). CPNC and The East Power Network oE China are planned to achieve the interconnection through two bi-poie DC links and three circuits of 500kV AC power ties for transfering about 6000-7000MW of electric power from the west to-the east. In order to enhance the transmission capability of the ties, the DC modulation principle, and its results, and its function in the TGHP AC-DC parallel transmission system...

    The planned Three-Gorge Hydro Project (TGHP) is located in The Central Power Network of China (CPNC). CPNC and The East Power Network oE China are planned to achieve the interconnection through two bi-poie DC links and three circuits of 500kV AC power ties for transfering about 6000-7000MW of electric power from the west to-the east. In order to enhance the transmission capability of the ties, the DC modulation principle, and its results, and its function in the TGHP AC-DC parallel transmission system are described in this paper. The minimal time control theory is used for DC modulation and the sub-optimum control modes are suggested, i.e. phase angle shif (A) and frequency shif (f) modulating modes. During fault condition either in EHVAC or HVDC, 0 or f is used as a control signal to change the transfer power of HVDC immediately, thus the whole interconnected AC-DC system will reach a stable state within a minimal time period. As the digital study indicated that the power unbalance between the sending and receiving ends caused by either the severe fault on the EHV tie-line or the permanent fault on two poles of HVDC line can be decreased rapidly, and the power oscillation can also be damped effectively. Using above stated modulation method, the transfer capability of TGHP can be increased by 10%. Instead of DC modulation, the strategy of generator triping 4x500MW at TGHP will be necessary to maintain similar stability level.

    本文利用最短时间控制原理研究三峡直流调制,并按次最优控制提出了两种直流调制方法。该方法对交流故障和直流故障均适用,可以有效地抑制系统振荡,明显改善系统的暂态稳定性能,提高交直流并联输电的能力。本文还对直流调制与切机措施作了比较。同时对直流调制信号的选取及调制量的整定也作了探讨。

     

    << 更多相关文摘    

     相关查询

     



     

    CNKI小工具

    在英文学术搜索中查有关hydro project的内容

    在知识搜索中查有关hydro project的内容

    在数字搜索中查有关hydro project的内容

    在概念知识元中查有关hydro project的内容

    在学术趋势中查有关hydro project的内容

     

     


      本文关键词:《水利水电工程钢闸门设计规范》可靠度初校,,由笔耕文化传播整理发布。



    本文编号:213765

    资料下载
    论文发表

    本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/213765.html


    Copyright(c)文论论文网All Rights Reserved | 网站地图 |

    版权申明:资料由用户e3971***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com