水电项目 在 工业经济 分类中 的翻译结果
本文关键词:水利水电项目经济风险的模糊分析方法,由笔耕文化传播整理发布。
在分类学科中查询 所有学科 工业经济 水利水电工程 环境科学与资源利用 电力工业 行政学及国家行政管理 投资 历史查询
水电项目
Studies on investment environment and policies of quasi-public interest hydropower project
准公益性水电项目投融资环境及政策研究
短句来源
Optimization purchases for hydropower project of World Bank credit
世行贷款水电项目的优化采购
短句来源
On Sustainable Strategy of Exploiting Hydropower Project
水电项目开发可持续发展措施探析
短句来源
Carrying out Investment System Reform Decision and Fulfilling Hydropower Project Examination and Approval
贯彻投资体制改革决定 做好水电项目核准工作
短句来源
Under the new economic system, Hydropower investors have been exploring newManagement Mode of Hydropower Project in order to get maximum return ofinvestment.
在新的经济体制下,水电投资者为了获得最大的投资效益,在不断地探索新的水电项目管理模式。
短句来源
更多
Research on investment distribution method for multi-objective hydropower projects
多目标水电项目投资分摊方法研究
短句来源
Fuzzy analysis method for economic risk of water resources and hydropower projects
水利水电项目经济风险的模糊分析方法
短句来源
SIMULATION-BASED FINANCIAL RISK ANALYSIS FOR LARGE-SCALE HYDROPOWER PROJECTS
基于模拟技术的大型水电项目财务风险分析
短句来源
Financing & Capital Operations of Large Hydropower Projects——A Summary Review of Financing Strategies & Practices in Three Gorges Project
大型水电项目融资与资本运作——三峡工程10年来的融资策略及实践
短句来源
Research on Investment-Distribution-Method for Multi-Objective Hydropower Projects
多目标水利水电项目费用的分摊研究
短句来源
更多
A Multi-objective Fuzzy Decision Method for Hydroelectric Power Project Investment
水电项目投资的多目标模糊决策方法
短句来源
Problem of multi objective decision for hydroelectric power project investment is proposed in this paper.
对水电项目投资方案多目标决策问题进行了研究 .
短句来源
On the basis of fundamental principle of multi objective fuzzy optimization,this paper advanced a multi objective fuzzy model to optimize hydroelectric power project investment schemes based on the regressive and composite method that analyses the objective importance. Numerical results show availability and effectiveness of multi objective decision for hydroelectric power project investment by an example.
根据多目标模糊优化的基本原理 ,结合目标相对优属度概念 ,给出了多目标模糊决策中通过回归确定权重的方法 ,同时提出了基于权重回归组合的水电项目投资多目标决策模糊优化方法 ,通过实例验证了该模型的合理性和有效性
短句来源
Speed up hydropower development in the western area
调低水电项目最低资本金比率 加快西部水电开发
短句来源
Five-year development and new achievement of hydropower construction:Review of investigation and design for West to East Power Transmission Project
五年大开发 水电谱新篇——贵州西电东送工程首批水电项目勘测设计工作回顾
短句来源
Thinking on the standardization of bidding and tendering for the investigation and design of hydro-engineering projects
水电项目勘测设计招投标规范化问题的思考
短句来源
The Analysis of Risks for WuLing Hydropower Development Corporation
五凌水电项目建设风险管理研究
短句来源
The author further gives some recommendations on financing problem dealing with the hydroelectric power industry in Sichuan Province based on the above-mentioned conclusions as follows:
本文共分三个部分。 第一部分主要是提出问题,第二部分对水电项目在市场条件下融资出路作了理论探讨,并以此为基础,对解决四川水电产业的融资问题提出了三个层次的对策。
短句来源
更多
查询“水电项目”译词为用户自定义的双语例句
我想查看译文中含有:的双语例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
hydropower project
Design of high precision horizontal control network for large-scale hydropower project
The application of various criteria and certain new approaches to design is illustrated by the example of the Lower Collierville Pressure Tunnel of the North Fork Stanislaus River Hydropower Project in California.
A background of the toppling slope failures associated with a large hydropower project in China instigated the need for the centrifuge study.
The Green Hydropower project aimed at establishing an environmental product label for hydropower plant operation, which should help overcome these problems.
Assessment of the impact of the Lower Kihansi Hydropower Project on the forests of Kihansi Gorge, Tanzania
更多
hydropower projects
It is proved that air entrainment is one of the efficient measures dealing with cavitation control for the release works of hydropower projects.
Four improved expressions of the emergence angle with weight coefficient were investigated through experimental data of 68 points observed from 12 aerators of 6 hydropower projects, of both model and prototype, on the basis of error theory.
Assessment of man-made and natural hazards in the surroundings of hydropower projects under construction in the beas valley of n
These resources have been supporting enough for the generation of electricity through introducing hydropower projects since the last decade.
Due to the fragile nature of topography and delicacy of ecology of the Himalaya, it results in lot of disturbances because of high degree of human interferences like construction of major hydropower projects.
更多
hydroelectric power project
A segment discusses the issues surrounding the James Bay Hydroelectric Power Project.
t is essential to scientifically account the accumulations provided by hydropower plant for realizing rolling development of hydropower projects.This paper analyzes the British power reform in respect to establishment of power commodity market,realization of power plant into electric network under independent accounting,improvement of power price and establishment of settle accounts.The results show that it is possible to perform independent accounting for hydropower plant.Some suggestions are provided.
科学地核算水力发电厂提供的积累是实现水电项目滚动开发的必要条件。本文通过剖析英国电力体制改革中如何建立电力商品市场.如何实现发电商在独立核算的条件下竞争上网.如何改革电价体制.如何建立结算制度入手.表明水力发电厂是可以实行独立核算的。并在此基础上对某些观点提出见解。
In order to study and deal with the exist question of local hydraulic and hydroelectric construction item and accelerate the construction of local hydraclic and hydroelectric item, through the investigation of four important hydraulic and hydroelectric construction item in Fuzhou and Jian Prefecture in Jiangxi province, we can find some generality questions and put forward the measurement.
为研究与解决地方水利水电建设项目中存在的问题,加快地方水利水电项目的建设,通过对江西省赣州、吉安两地区的4个省重点水利水电建设项目的调查,发现一些带有共性的问题并提出了解决办法.
The principles of pricing the electricity in the power network which are stipulated by the State authorities concerned mainly include the peak valley time sharing power tariff principle, power tariff principle during high and low water periods, and the principle for new price for new power. The estimating method of the power tariff for new hydropower project is counter derived on the basis of loan principle and interest repayment during the loan repayment and then calculated based on meeting the needs of...
The principles of pricing the electricity in the power network which are stipulated by the State authorities concerned mainly include the peak valley time sharing power tariff principle, power tariff principle during high and low water periods, and the principle for new price for new power. The estimating method of the power tariff for new hydropower project is counter derived on the basis of loan principle and interest repayment during the loan repayment and then calculated based on meeting the needs of the base benefit rate of power industry after the completion of loan repayment; or is estimated based on the rise trend of power tariff in the power network and the user's affording capacity; or is estimated by the marginal cost method; or is estimated by adopting the rational financial profit rate. For estimating the power tariff of hydropower project with long construction period, all the following factors shall be taken into account, that is, the inflation factor, the loan interest during construction period, the payable profit repayment and the power price during the operation period.
国家有关部门规定的上网电价确定原则主要包括峰谷分时电价原则、丰枯电价原则和新电新价原则。水电建设项目上网电价的测算主要有以下几种方法:还贷期间按归还贷款本息反推,还清贷款后按满足本行业基准收益率测算;根据电网电价的上涨趋势及用户的承受能力测算;采用边际成本法测算;采用合理的资金利润率测算。在测算建设期较长的水电项目上网电价时,要考虑通货膨胀因素对上网电价的影响、建设期应计利息的划分、资本金应付利润的支付、拉平初期运行期电价等问题。
 
本文关键词:水利水电项目经济风险的模糊分析方法,由笔耕文化传播整理发布。
,本文编号:218426
本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/218426.html