QDPJ集团视频信息交互系统项目进度管理研究
[Abstract]:In the era of high-speed development of information age, computer network technology is widely used in the field of human's life and work, and the emergence of network interconnection technology marks the coming of the era of network information interconnection. With the development of multimedia technology, the multimedia technology, such as web browsing, multimedia conference, distance learning and on-line interaction of e-commerce, has become the leading role of network communication. The video conference technology is widely used in the information communication of the various industries of the society by means of the advantages of large amount of information, convenience and real-time communication. Its unique advantages improve people's working efficiency and bring immeasurable social and economic benefits to the world. In order to meet the requirements of the market of QDPJ Co., Ltd. and the development of the enterprise itself, a video information interaction system is introduced. The system saves time, reduces cost, fast positioning and real-time communication, meets the requirement of enterprise development, and fundamentally solves the problem of the location and communication of the enterprise in different places. Before the introduction of the video conference system, the Qingdao Beer Co., Ltd. first carried out market research, analyzed the demand of the market and technology in advance of the video system, and wrote the feasibility analysis report, and the global planning of the project of the QDPJ video conference system was made through the analysis. After the completion of the planning, the second investigation is carried out according to the feasibility analysis report according to the feasibility analysis report, and then the design and implementation of the video information interaction system is made. By analyzing the project design and construction scheme, the project's construction involves the theory of quality management, progress management, resource management and information management in the project management theory. Before the implementation of the project of this video interactive system, the Group's branches and the Qingdao headquarters are required to have the SDH 2M interconnection line, and each branch of the group shall be equipped with the video conference terminal; the communication of the internal personnel shall be carried out by means of the LAN. The system performs the LYNC fusion test for the existing network environment, the conference environment and the LYNC communication client, and utilizes the complete, standard-based, interoperable and end-to-end solutions provided by Microsoft and Polycom to realize the coverage of voice, video, on-line status, a multi-function interactive system, such as conference and collaboration. in which, the technology of instant message, voice, WEB conference and desktop sharing is combined with the video technology of the Polycom meeting room, so that the user, whether by means of a software client of a notebook, uses a desktop-based desktop-based application to the Lync desktop terminal, and provides a desktop-type video terminal in cooperation with the data, The conference room terminal of the large conference room has the corresponding product support, which realizes the high-quality video communication, whether in an emergency meeting in the field or on the office application of the desk phone. This paper, based on the theory of project management theory, has completed the research on the implementation progress control of the project of the video information interactive system of QDPJ Co., Ltd. through the application of the principle, process and scientific method of project schedule and control in practice. In this paper, through the analysis of the project's general situation, the implementation of the detailed analysis and description of the detailed bamboo, the progress plan, the details of the control and the schedule of the progress, the paper, with the aid of the network diagram, has developed a reasonable project plan and scientific setting project-related organization. Establish and improve the functions of relevant departments as well as the arrangement of scientific implementation project schedule control. This paper puts forward a reasonable solution to the specific problems encountered in the project schedule management of the QDPJ video conference system, and puts forward the solution by analyzing the problems of coordination and organization and management in the project schedule control. and finally, the progress control assessment analysis evaluation table of the project construction of the information interaction system is obtained, and then the comprehensive evaluation and the prediction analysis of the whole project progress control are realized, and the reasonable and correct conclusion is finally obtained.
【学位授予单位】:中国海洋大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TN948.63
【相似文献】
相关期刊论文 前10条
1 张俊光;;中小型软件项目进度管理方法研究[J];管理现代化;2011年05期
2 梁礼方;;项目进度管理(上)[J];金融科技时代;2013年09期
3 李俊彦;;如何在通信建设过程中实施项目进度管理分析[J];信息与电脑(理论版);2012年01期
4 王姗姗;;浅析基于Microsoft Project软件的项目进度管理[J];经营管理者;2014年01期
5 施灿彬,宋志航;基于Web的项目进度管理系统[J];山西建筑;2004年21期
6 吴宗岳;;论项目进度管理[J];信息与电脑(理论版);2012年08期
7 麦高波;杨荣华;;清华斯维尔软件在房地产项目进度管理中的运用[J];山西建筑;2013年35期
8 赵琦;;Project软件在国家骨干高职建设项目进度管理中的运用[J];电脑知识与技术;2012年21期
9 方德坚;张杨华;;也谈软件项目进度管理[J];赤峰学院学报(自然科学版);2011年05期
10 杨丹;;用VSTS实现数字化的软件项目进度管理[J];程序员;2009年07期
相关会议论文 前3条
1 杨正茂;;维生素C质量升级项目进度管理研究[A];第十届沈阳科学学术年会论文集(农业科学与医药科学分册)[C];2013年
2 高华北;张花玲;周湘晖;黄曦;丁霞;王丽;鄢旭辉;严国兴;;甘特图在职业病危害评价项目进度管理中的应用[A];湖南省预防医学会劳动卫生专业委员会2008年学术交流会议论文集[C];2008年
3 孙慧;王丽华;;多层次模糊控制在工程项目进度管理中的应用[A];2005年中国机械工程学会年会论文集[C];2005年
相关重要报纸文章 前7条
1 彭洁;昆明办审计项目进度管理实现规范化[N];中国审计报;2013年
2 ;辽宁审计厅出台审计项目进度管理办法[N];财会信报;2010年
3 曹忻;云南省审计厅实行项目进度管理[N];中国审计报;2010年
4 项荣;深圳办加强审计项目进度管理[N];中国审计报;2012年
5 小城;辽宁出台审计项目进度管理办法[N];中国税务报;2010年
6 记者 李颖;增强藏区自我造血能力 助推藏区跨越发展[N];成都日报;2014年
7 通讯员 刘永良;双永高速永定段完成投资15亿元[N];闽西日报;2010年
相关博士学位论文 前2条
1 魏从刚;网络化协同制造项目进度管理技术研究[D];西北工业大学;2006年
2 张敏;项目进度管理的行为不确定性及其控制策略研究[D];华中科技大学;2011年
相关硕士学位论文 前10条
1 秦国祥;HP公司软件项目进度管理研究[D];华东理工大学;2015年
2 樊艳冬;DB总承包模式公路建设项目进度管理研究[D];长安大学;2015年
3 毛红峰;法雷奥后雾灯开发项目进度管理研究[D];兰州大学;2015年
4 李婷婷;A公司服务器新产品开发项目进度管理研究[D];苏州大学;2015年
5 周鹏超;基于4D-BIM技术的工程项目进度管理研究[D];江西理工大学;2015年
6 温洪彬;移动通信工程项目进度管理的优化研究[D];北京建筑大学;2014年
7 卫红霞;双河110kV智能变电站项目进度管理研究[D];华北电力大学;2015年
8 孙卓;110kV阳城变电站改造项目进度管理研究[D];华北电力大学;2015年
9 孙润润;基于BIM的城市轨道交通项目进度管理研究[D];中国矿业大学;2015年
10 张国胜;表面废水处理工程项目进度管理研究[D];中国科学院大学(工程管理与信息技术学院);2015年
,本文编号:2384120
本文链接:https://www.wllwen.com/kejilunwen/wltx/2384120.html