移动基站建设工程项目风险管理研究
[Abstract]:The realization of mobile communication needs the equipment of the radio station, and the radio station is the mobile base station. In the area with radio, the main and important facility to support the mobile phone call and other data service function is the mobile base station. The construction of mobile base station will be a high risk and high investment project. The success of the project is affected by many factors, from the base station construction planning to the implementation of the whole process of various uncertain factors. If we can clearly understand and manage many uncertain risk factors in the construction and implementation of mobile base station, to some extent, we can improve the comprehensive benefit of the base station construction project, and improve the progress, quality and reliability of the base station construction project. In order to reduce the corresponding management pressure and avoid the interference of risk factors, the expected goal of mobile base station construction is fully guaranteed. In view of this, the author analyzes the application of risk management in the construction project of Chengdu Mobile Base Station under the background of the actual situation of the current work in the Mobile Company, taking the new phase of Chengdu Mobile Base Station Construction Project as the background, and analyzes the application of risk management in the construction of the base station project. Research on risk control strategy of mobile base station construction project is put forward. At the same time, I hope to apply the theories, methods and tools of project management and project risk management to the base station construction project of Chengdu Mobile Company, and contribute to the goal of introducing project risk control into the base station construction of Chengdu Mobile. It is beneficial to realize the fine management goal advocated by Chengdu Mobile Company's communication equipment access project, and to improve the quality of Chengdu Mobile Communication Construction Project. In order to improve the return on investment of related projects and mobile communication industry high-speed, healthy development contribution. Based on the above background, the thesis is divided into six parts. In this paper, the background, purpose and significance of the research are expounded, and the contents, methods and technical route of the research are pointed out. Then summarizes and arranges the related theories of project management and risk management, at the same time summarizes the domestic and foreign research status of construction project risk management; Then according to the project risk identification methods and standards, the mobile base station construction project risk identification analysis, collate the project risk factors; Then according to the project risk evaluation criteria and occurrence probability, the qualitative analysis and quantitative evaluation of the project risk are carried out. In addition, according to the characteristics and difficulties of project risk management, the paper puts forward the strategy of project risk control, response and dynamic monitoring, and puts forward the proposal of project emergency management. Finally, the conclusion of the paper is drawn. In this paper, the typical characteristics of mobile base station construction project risk management practice as the entry point, on its specific problems and countermeasures to carry out research, The methods and measures of risk management play a certain role in the actual promotion of Chengdu Mobile Extranet project, and also provide a valuable reference for the risk management of similar information management system projects.
【学位授予单位】:电子科技大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TN929.5
【参考文献】
相关期刊论文 前10条
1 李永海;;考虑风险关联的项目风险应对的案例决策分析方法[J];系统工程;2016年06期
2 许晓翠;;信息系统项目建设风险管理的思考[J];电子制作;2015年12期
3 吕文学;李洪梅;;工程项目管理的国际化[J];国际经济合作;2015年01期
4 覃宁;;浅议电网企业信息系统开发建设项目风险管理[J];中国新技术新产品;2012年24期
5 徐立;;浅谈信息系统项目的风险管理[J];计算机光盘软件与应用;2012年01期
6 刘鸣;高艳;;工程建设项目应急管理系统研究[J];项目管理技术;2011年03期
7 强茂山;林正航;阳波;;项目管理的多维度集成创新模式研究[J];科技进步与对策;2010年19期
8 汤玉江;;水利工程施工阶段的质量控制及质量保证措施[J];科技创新导报;2009年06期
9 李强;张静;张耀坦;;蒙特卡洛仿真技术在工程进度计划中的应用[J];长江大学学报(自科版)理工卷;2007年02期
10 魏波周;;浅谈施工项目和进度的管理[J];科技咨询导报;2007年10期
相关博士学位论文 前1条
1 赵华;风险分担对工程项目管理绩效的作用机理研究[D];天津大学;2012年
相关硕士学位论文 前5条
1 彭琨;基于WEB的成都移动基站管理系统设计与实现[D];大连理工大学;2016年
2 王小枫;项目管理在移动应急通信保障中的应用[D];南京邮电大学;2012年
3 籍晨香;电信运营商3G工程项目风险管理研究[D];太原理工大学;2010年
4 郑经威;TD-SCDMA基站建设项目风险管理研究[D];复旦大学;2008年
5 张东;供应商物料管理评价方法在客车行业的应用[D];上海交通大学;2007年
,本文编号:2320118
本文链接:https://www.wllwen.com/kejilunwen/xinxigongchenglunwen/2320118.html