当前位置:主页 > 科技论文 > 信息工程论文 >

广西地市级联通无线网2014-2016年三年滚动规划的研究

发布时间:2019-02-14 15:51
【摘要】:3年滚动规划是一个公司未来3年通信网络建设的指导,做好3年滚动规划可以通过整理网络现状、分析现网优劣势,预测网络的发展规模,为网络优化发展和建设提供依据,对运营商发展具有很重要的意义。本论文对广西柳州联通2014-2016年3年滚动规划情况进行了研究。本文首先阐述了移动通信系统的发展历程并介绍了WCDMA的网络架构和关键技术。在此基础上,提出未来WCDMA网络发展总体目标,对建设策略和技术规范提出了要求。本规划充分分析了网络发展现状,通过路测、CQT、数据流量、话务量、投诉、MR等多种数据,查找网络的问题,整合多维度的需求,形成需求项目库,并结合业务部门需求和网络业务发展的需求,依据原则进行筛选,编写投资估算,形成规划项目库,从提升客户感知和品牌效应角度,完成刚性覆盖,按7维度评价标准对非刚性覆盖区站点进行量化排序,从而得出最终建设方案,对未来3年建设提供了重要指导。本次规划以提升用户感知和业务能力为目标,依照“增强网络能力、优化结构布局、提高投资有效性”的原则,围绕无线网等重点网络做实规划,为落实投资建设管理模式变革奠定基础,加快了效益发展,提高资源配置水平,提升企业价值。
[Abstract]:The 3-year rolling plan is a guide to the construction of the company's three-year communication network. The 3-year rolling plan can be used to organize the current situation of the network, analyze the current network's advantages and disadvantages, forecast the development scale of the network, and provide the basis for network optimization development and construction. It is of great significance to the development of operators. This paper studies the rolling planning of Liuzhou, Guangxi, 2014-2016. This paper first describes the development of mobile communication system and introduces the network architecture and key technology of WCDMA. On this basis, the overall goal of the future WCDMA network development is put forward, and the requirements for the construction strategy and the technical specification are put forward. The planning fully analyzes the current situation of the development of the network, and through road test, CQT, data flow, traffic, complaint, MR and other data, finds the problem of the network, integrates the multi-dimensional requirements, forms a demand project library, and combines the demand of the business department and the development of the network business, screening according to the principle, preparing the investment estimation, forming a planning project library, completing the rigid cover from the angle of improving the customer perception and the brand effect, performing quantitative sequencing on the non-rigid coverage area sites according to the 7-dimension evaluation standard, and then obtaining the final construction scheme, It has provided important guidance for the construction of the next three years. In order to improve the user's perception and business ability, according to the principle of the 鈥淓nhance network capability, structure layout, and improve investment effectiveness鈥,

本文编号:2422356

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/xinxigongchenglunwen/2422356.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户ecb63***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com