本文选题:项目管理 + 重大专项 ; 参考:《北京化工大学》2014年硕士论文
【摘要】:项目管理(Project Management)就是为了实现项目目标,而对项目涉及的所有工作进行规划和组织的全过程。从项目的投资决策到项目结束的整个过程中,项目管理要在有限的资源下,运用科学的方法对项目的所有工作进行系统的管理。项目管理包括六部分的内容,它们分别是:项目计划、项目组织、项目指挥、项目协调、项目控制和项目评价。大型先进压水堆核电站重大专项是《国家中长期科学和技术发展规划纲要(2006—2020年)》确定的“大型先进压水堆及高温气冷堆核电站”重大专项的分项,是与我国建设创新型国家的发展战略紧密结合的重大科技工程,具有十分重大的战略意义和必要性。利用先进的项目管理理论,管理具有我国自主知识产权的大型先进压水堆核电站,符合国际核电技术的发展趋势,有利于我国核电产业实现跨越式发展。本文首先介绍了压水堆重大专项的背景,在总结了国内外核电发展现状和分析了核电发展趋势后,重点介绍了压水堆核电站重大专项示范工程总体技术方案和示范工程的建设,论述了重大专项的组织管理与机制创新,分析了项目的经费估算和筹资方案。最后本文通过效益和风险分析,从几方面对项目实施进行了评价,得出了切实的评价结果,认为本项目意义重大、切实可行。
[Abstract]:Project Management is the whole process of planning and organizing all the work involved in the project in order to achieve the goal of the project.During the whole process from the investment decision to the end of the project, the project management should systematically manage all the work of the project under the limited resources and the scientific method.Project management consists of six parts: project planning, project organization, project direction, project coordination, project control and project evaluation.The major project for large-scale advanced PWR nuclear power stations is a sub-item of the "large Advanced PWR and High temperature Gas-cooled reactor Nuclear Power plants", which was defined in the National Medium- and Long-Term Science and Technology Development Program for 2006-2020.It is an important scientific and technological project which is closely combined with the development strategy of building an innovative country in our country, which is of great strategic significance and necessity.Using advanced project management theory to manage large scale advanced PWR nuclear power plants with independent intellectual property rights in China is in line with the development trend of international nuclear power technology and is conducive to the development of nuclear power industry in China by leaps and bounds.This paper first introduces the background of the PWR major project, after summarizing the domestic and foreign nuclear power development status and analyzing the nuclear power development trend, the overall technical scheme and the construction of the demonstration project of the PWR nuclear power plant major demonstration project are emphatically introduced.This paper discusses the organization, management and mechanism innovation of major special projects, and analyzes on the estimation of project funds and the scheme of raising funds.Finally, through the analysis of benefit and risk, this paper evaluates the implementation of the project from several aspects, obtains the practical evaluation results, and thinks that the project is of great significance and feasible.
【学位授予单位】:北京化工大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TM623.91
【参考文献】
相关期刊论文 前1条
1 郑明光;叶成;韩旭;;新能源中的核电发展[J];核技术;2010年02期
,本文编号:1752490
本文链接:https://www.wllwen.com/falvlunwen/zhishichanquanfa/1752490.html