当前位置:主页 > 管理论文 > 工商管理论文 >

A公司大型煤制油项目工程施工合同风险管理研究

发布时间:2018-12-29 18:02
【摘要】:A公司煤制油项目是一次性投资建设规模最大的世界级煤化工项目,具有技术复杂、工程量大、管理界面多、管理难度高的特点。煤制油项目工程施工合同总金额在煤制油项目投资中占比较大,对工程施工合同风险管理的效果,直接影响煤制油项目工程建设的成效。那么,对工程施工合同风险管理的研究,一方面有利于总结煤制油项目工程施工合同风险管理经验,另一方面可以探索有益的工程施工合同风险管理方法和手段。本文通过借鉴国内外工程施工合同风险管理研究现状,以煤制油项目工程施工合同风险管理为研究对象,通过查阅资料,基于工程施工合同风险管理相关理论基础上,在项目参与单位内运用实地调查法和访谈法,结合煤制油项目工程施工合同风险管理的内容和现状,从业主的视角以工程施工合同风险全过程管理为出发点,使用A公司经济本安体系中的风险分析准则和评价准则,重点针对工程施工项目招标阶段和履行阶段的突出问题进行了探讨和分析研究,列出了风险评价清单并提出一些主要的工程施工合同风险管理控制措施。希望对A公司后续煤化工项目建设的工程施工合同风险管理具有一定的借鉴作用和参考价值。
[Abstract]:The coal oil production project of Company A is a world-class coal chemical project with the largest scale of one-time investment, which has the characteristics of complex technology, large amount of engineering, multi-management interface and high management difficulty. The total amount of construction contract of coal oil production project accounts for a large amount of investment in coal oil production project. The effect of risk management on project construction contract directly affects the effect of coal oil production project construction. Therefore, the study on risk management of engineering construction contract is beneficial to sum up the experience of risk management in construction contract of coal oil project on the one hand, and to explore beneficial methods and means of risk management of construction contract on the other hand. Based on the current situation of risk management of construction contract at home and abroad, this paper takes the risk management of construction contract of coal oil project as the research object, and based on the relevant theory of risk management of engineering construction contract, through consulting information. By using field investigation and interview method in the participating units of the project, combined with the content and present situation of the risk management of the construction contract of the coal oil production project, the whole process management of the project construction contract risk is taken as the starting point from the angle of view of the owner. By using the risk analysis criteria and evaluation criteria in the economic and intrinsic safety system of Company A, the paper discusses and analyzes the outstanding problems in the bidding and performance stages of engineering construction projects. The risk evaluation list is given and some main measures of risk management and control for construction contract are put forward. It is hoped that it can be used for reference and reference value for the construction contract risk management of the follow-up coal chemical project construction of company A.
【学位授予单位】:宁夏大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TQ529;F426.7

【参考文献】

相关期刊论文 前1条

1 贾宏俊;徐晨;;业主方工程施工合同风险管理浅析[J];山西建筑;2010年34期

相关硕士学位论文 前3条

1 李宝山;基于新版建设工程施工合同的发包人合同风险管理研究[D];中国矿业大学;2015年

2 卢龙强;S公司合同风险管理问题研究[D];大连理工大学;2014年

3 魏文涛;建设工程合同管理与索赔研究[D];青岛理工大学;2011年



本文编号:2395178

资料下载
论文发表

本文链接:https://www.wllwen.com/gongshangguanlilunwen/2395178.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户2bfcc***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com