【摘要】:以中国国际贸易中心三期B阶段基坑工程为背景,针对深大基坑处理技术面临的相邻建筑物距离近、开挖深度大、建设施工环境恶劣、场区水文地质条件差、开挖受土体失稳变形、渗流共同作用的复杂问题,深入分析了深大基坑处理技术在城市建设中的应用。通过深大基坑围护结构分析模型的建立,得出不同开挖深度基坑的围护结构变形、土压力计算结果,为选择合适的基坑边坡支护形式提供依据。采用极限平衡法对基坑及支护结构进行稳定性研究,计算其稳定系数,通过使用变位分析对支护结构的变形和内力进行计算,对设计参数进行研究,并根据研究结果对设计进行调整和优化。针对现场实际的基坑渗流问题对基坑影响的研究,采用“止水帷幕+基坑内降水”、“超高压桩间旋喷水泥浆+护坡桩”和在基坑外侧对变形比较敏感的区域设置观测井的处理方式,实现全封闭止水帷幕切断坑内外水力联系、实现基坑内潜水与第一层承压水的有效降排和水位的定期观测。在原有建筑护坡桩上进行钢筋应力监测、锚杆拉力监测、护坡桩斜侧观测、护坡桩定位移观测、地下水位变化观测,设立预警系统,确保止水帷幕完整和临近建筑物的安全。
[Abstract]:Based on the third stage B foundation pit project of the China International Trade Center, the adjacent buildings are close, the excavation depth is large, the construction environment is bad, and the hydrogeological conditions in the field area are poor, which is faced by the treatment technology of deep and large foundation pit. The application of deep and large foundation pit treatment technology in urban construction is deeply analyzed. Through the establishment of the analysis model of the retaining structure of deep and large foundation pit, the deformation of the retaining structure and the calculation result of earth pressure of the foundation pit with different excavation depth are obtained, which provides the basis for selecting the appropriate supporting form of the slope of the foundation pit. The stability of foundation pit and supporting structure is studied by limit equilibrium method, and the stability coefficient is calculated. The deformation and internal force of supporting structure are calculated by displacement analysis, and the design parameters are studied. According to the research results, the design is adjusted and optimized. In view of the study on the influence of the seepage problem on the foundation pit, the "dewatering in the pit of the waterproof curtain" is adopted. "Super-high pressure pile with rotary grouting cement slurry for slope protection" and the treatment method of setting observation wells in the areas outside the foundation pit that are sensitive to deformation can realize the complete sealing curtain to cut off the hydraulic connection inside and outside the pit. The submersible in foundation pit and the effective discharge of the first confined water and the regular observation of the water level are realized. The reinforcement stress monitoring, anchor tension monitoring, slope protection pile slope observation, slope protection pile location and displacement observation, groundwater level change observation, setting up early warning system are carried out on the original building slope protection pile to ensure the integrity of the waterproof curtain and the safety of the adjacent buildings.
【学位授予单位】:石家庄铁道大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TU753

【参考文献】

相关期刊论文 前10条

1 汤见勇;;地下连续墙防渗漏技术的探讨与应用[J];建筑施工;2012年11期

2 李松;杨小平;刘庭金;黄俊光;;紧邻深基坑施工的风险分析及三维数值模拟[J];施工技术;2012年18期

3 尹盛斌;丁红岩;;基坑周围深层土体沉降预测研究[J];施工技术;2012年08期

4 陈焘;周顺华;宫全美;;多重组合式基坑群工程施工风险研究[J];城市轨道交通研究;2012年03期

5 王旭军;;上海中心大厦裙房深大基坑工程围护墙变形分析[J];岩石力学与工程学报;2012年02期

6 章晓鹏;;软土地基超大、超深基坑工程中的围护方案选型研究[J];建筑施工;2011年06期

7 梁成华;王之军;吕海滨;;桩间特定深度帷幕止水在深大基坑工程中的应用[J];探矿工程(岩土钻掘工程);2010年05期

8 张睿华;;深大基坑内相邻基坑施工时的相互影响分析[J];建筑施工;2008年10期

9 曾定帮,彭文祥;双排桩与止水帷幕复合支护在基坑围护中的应用[J];岩土工程界;2005年06期

10 王卫东,吴江斌,翁其平;基坑开挖卸载对地铁区间隧道影响的数值模拟[J];岩土力学;2004年S2期



本文编号:2115430

资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/chengjian/2115430.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户b8d45***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com