商业综合体电梯安装工程项目管理流程改善研究
[Abstract]:With the widespread rise of commercial complex projects, how to efficiently complete elevator installation in such projects has been paid more and more attention by elevator companies. The management process plays a fundamental role in the installation project. By studying the experience and lessons of the commercial complex elevator project in the past, this paper finds that the clear degree of the flow chart is the key to the success of the project. Therefore, the purpose of this paper is to summarize the process involved in the construction of commercial complex elevator, and to improve the installation process of commercial complex elevator in combination with the actual situation on the spot. In order to provide reference for other commercial complex elevator projects, it is of great significance to improve the installation process of commercial complex elevator. In this paper, the management flow in the installation process of commercial complex elevator is taken as the research object. Aiming at the difficulties and common problems in the installation process, this paper analyzes the main process problems and causes, and looks for the improvement links so as to realize the improvement of the process. This paper uses management methods including Gantt chart, critical path method, inventory management, on-site 6S, Kanban method and supply chain management. The content is mainly built around the key path of the commercial complex elevator installation process. Improvement of site management and handling of common problems are carried out in several aspects. In a word, the improvement of the project management process of the commercial complex elevator installation project is a long-term and continuous work. With the development of the elevator technology and the rapid change of the external requirements, the project management process of the elevator installation project will also keep pace with the times. However, as long as we grasp the basic management process and cooperate with the advanced management concept, combined with the actual situation on the spot, we will eventually provide customers with high quality commercial complex elevator.
【学位授予单位】:天津大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TU857;TU712
【相似文献】
相关期刊论文 前10条
1 郭松保;电梯安装三字经[J];现代城市研究;2003年S1期
2 蔡永忠;;浅谈电梯安装工程的质量控制[J];科协论坛(下半月);2008年04期
3 詹克让;;电梯安装质量问题的探讨[J];企业标准化;2008年17期
4 胡柱强;;电梯安装检测质量安全分析[J];广东科技;2009年18期
5 蒋屹;;电梯安装工程项目管理工作研究[J];装备制造技术;2010年10期
6 马子良;;电梯安装检验中应注意的几个问题[J];民营科技;2012年01期
7 李兴;;电梯安装检验中若干问题探讨[J];科技风;2014年01期
8 邓生材;;浅议电梯安装工程项目管理工作[J];科技致富向导;2010年18期
9 刘向勇;;浅谈电梯安装工的培养[J];现代企业教育;2010年14期
10 刘建荣;监理对电梯安装工程的质量控制[J];工程建设与设计;2000年05期
相关会议论文 前1条
1 杨慧锋;;电梯安装工程实践[A];土木建筑学术文库(第11卷)[C];2009年
相关重要报纸文章 前10条
1 史玉成;北京电梯安装养护要实行新标准[N];中国质量报;2007年
2 本报记者 韩庆文 通讯员 史剑 于璐;五项流程缺一不可[N];广东建设报;2009年
3 ;抢占“制高点”[N];建筑时报;2009年
4 田夫 志敏 志洪 小波;能者为师上讲台[N];常州日报;2010年
5 于晓颖;电梯安装国家职业标准在京试行[N];中国建材报;2011年
6 本报记者 洪敬谱;两部电梯安装4年不能正常使用[N];中国消费者报;2011年
7 记者 曹飞;我市给电梯安装维保立规矩[N];大同日报;2012年
8 窦新东 秦泽克;电梯安装 我行我秀[N];中国建设报;2006年
9 林子;安装:地位江河日下[N];中国房地产报;2012年
10 张玲邋红梅;安全状况量化体现 责任意识细节入手[N];中国质量报;2008年
相关硕士学位论文 前8条
1 郑昆明;基于全生命周期的电梯安装项目风险评估机制研究[D];山东大学;2011年
2 金勇;基于过程控制的电梯安装质量管理研究[D];电子科技大学;2008年
3 张震东;网络计划技术在电梯安装项目中的应用[D];上海交通大学;2009年
4 颜世君;项目质量管理在电梯安装项目中的应用[D];天津大学;2011年
5 毛玮;基于风险的西塔项目电梯安装工程安全管理研究[D];华南理工大学;2011年
6 徐浩菁;电梯安装及维修保养成本控制研究[D];浙江大学;2013年
7 项威;商业综合体电梯安装工程项目管理流程改善研究[D];天津大学;2014年
8 王雨婷;基于Unity3D的电梯安装仿真互动系统的设计与实现[D];东北大学;2014年
本文编号:2350748
本文链接:https://www.wllwen.com/guanlilunwen/chengjian/2350748.html