基于仿真的生产调度问题研究
[Abstract]:For many years, the scheduling problem of dynamic job shop has received extensive attention and research from engineering application personnel and experts and scholars. Usually the scheduling problem is Np-hard problem. Exact algorithms, such as integer programming, branch and bound method, and dynamic programming method, are not practical in solving large-scale scheduling problems. In practice, scheduling rules are widely used in dynamic job shop scheduling due to their easy implementation and low computational complexity. In this paper, a scheduling method based on scheduling rules and path selection rules is proposed for multistage production system scheduling with one or more machines at each level, and then the load level of the shop floor is analyzed in the dynamic workshop. The effect of failure rate level, workpiece path and job shop layout on the performance of scheduling rules. Specifically, the following aspects are studied: (1) the system, the advantages of system simulation, the basic steps of system simulation and its application in engineering are studied and analyzed. This paper introduces the characteristics of simulation software Arena and its application field, and compares the advantages and disadvantages of various kinds of popular software in detail. (2) aiming at the scheduling problem of multistage production system with one or more machines at each level, In this paper, a scheduling method based on scheduling rules and path selection rules is proposed. The scheduling rules determine the processing order of the workpieces on the machine, and the path selection rules enable the workpieces to select suitable machines for machining. The simulation model of scheduling problem in multilevel production system is established, and the scheduling rules and path selection rules are tested. The average flow time, average delay time, average work-in-process and average machine utilization rate are taken as system performance evaluation indexes. This paper compares 30 kinds of rules composed of 10 kinds of scheduling rules and 3 kinds of path selection rules. The scheduling rules combination of single index and multi-index is determined. (3) the performance of scheduling rules in two kinds of manufacturing systems, job shop and flow shop, is compared and studied. Four scheduling rules based on flow time and delay time are proposed. The average flow time, the maximum circulation time, the variability of the circulation time, the average delay time, the maximum delay time, the variability of the delayed workpiece and the percentage of the delayed workpiece are taken as the performance indexes of the scheduling rules. The influence of machine failure rate level, workshop load level, workpiece path and shop layout on scheduling rule performance is analyzed.
【学位授予单位】:兰州理工大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TB497
【参考文献】
相关期刊论文 前10条
1 王超;刘阶萍;常伟涛;赵军;;不确定条件下的作业车间生产调度综述[J];装备制造技术;2011年04期
2 王海瑶;蒋增强;葛茂根;;基于规则组合的Job Shop多目标柔性调度方法[J];合肥工业大学学报(自然科学版);2010年01期
3 ;Single machine stochastic JIT scheduling problem subject to machine breakdowns[J];Science in China(Series A:Mathematics);2008年02期
4 孙容磊,熊有伦,杜润生,丁汉;规则调度的迭代优化[J];计算机集成制造系统-CIMS;2002年07期
5 吴大为,陆涛栋,刘晓冰,孟永胜;求解作业车间调度问题的并行模拟退火算法[J];计算机集成制造系统;2005年06期
6 李素粉,朱云龙,尹朝万;具有随机加工时间和机器故障的流水车间调度[J];计算机集成制造系统;2005年10期
7 潘燕春;周泓;冯允成;;基于Arena的车间作业排序问题建模方法及其仿真优化系统设计[J];计算机集成制造系统;2006年03期
8 王国新;宁汝新;王爱民;;基于仿真的生产调度优化技术研究[J];计算机集成制造系统;2007年07期
9 刘昶;史海波;袁杰;;具有随机机器故障的制造过程建模与性能分析[J];计算机集成制造系统;2008年09期
10 王万良;王磊;王海燕;徐新黎;赵燕伟;;基于混合差分进化算法的作业车间动态调度[J];计算机集成制造系统;2012年03期
,本文编号:2197225
本文链接:https://www.wllwen.com/guanlilunwen/gongchengguanli/2197225.html