基于动态数据的实时调度系统
[Abstract]:Production scheduling has always been the core of job shop management. An effective scheduling system or optimization technology is the basis of realizing advanced manufacturing and the key to improve production efficiency. But a good complete scheduling system not only deals with static data, it needs to be able to deal with the problem in a timely and effective manner when the data changes or the machine fails. But the real production workshop is very difficult to solve this problem in time and effectively. The job-shop scheduling problem of real-time data has always been a complicated and huge problem, whether from the timely acquisition of data and the effective processing of data, it is a subject that we need to explore continuously. In order to solve the problem that the backstage management information of the enterprise workshop is backward and the updating of real-time data is not timely, this paper takes the common manufacturing workshop as the background and uses RFID to collect the real-time data. The collaborative scheduling system based on RFID real-time information is studied and designed, and the relevant solutions are proposed according to the specific dynamic scheduling problem. The RFID real-time information cooperative scheduling system designed in this paper mainly includes data acquisition module, information query and processing module and production scheduling module. In order to give full play to the function of scheduling system and deal with the real-time information of job shop effectively, this paper introduces in detail how to use RFID technology to obtain job shop scheduling information in the first time, and the information is transmitted to the scheduling system by colleagues for processing. Realize timely online optimization. On this basis, this paper describes the specific job-shop dynamic scheduling problem, gives the mathematical model of the specific job-shop dynamic scheduling, puts forward the greedy algorithm, and then gives the hardware simulation and function realization of the system. At the same time, the dynamic scheduling and processing method of the system is simulated and simulated under the environment of Microsoft Visual C 6.0, which shows and verifies the timeliness and effectiveness of the system in dealing with dynamic data.
【学位授予单位】:沈阳工业大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TB497;TP274.2
【共引文献】
相关期刊论文 前10条
1 彭其春,包燕平,田乃媛,王德城,张汉新,曾呈校;一体化生产管理系统炼钢计划子系统设计[J];北京科技大学学报;2002年01期
2 崔广才,陶丽华,杨敬松;基于混合遗传算法的车间作业计划调度方法[J];长春理工大学学报;2002年02期
3 马佳;高立群;李丹;刘佳;;求解单级多资源约束生产批量计划问题的免疫遗传算法[J];东北大学学报(自然科学版);2007年09期
4 韩毅;唐加福;王立岩;周根贵;;单级有资源约束的生产批量计划问题的元算法[J];东北大学学报(自然科学版);2009年08期
5 唐立新;热轧调度并行处理策略的多旅行商模型[J];东北大学学报;1999年02期
6 赵泉午,熊中楷,杨秀苔;有能力约束的单机经济批量计划问题优化模型[J];重庆大学学报(自然科学版);2005年03期
7 韩毅;周根贵;林华珍;蔡建湖;黄书汉;;多资源约束批量计划问题的分散搜索算法[J];工业工程;2010年01期
8 唐立新;基于智能优化的钢铁生产计划与调度研究[J];管理学报;2005年03期
9 李铁克;施灿涛;;冷轧生产批量计划与调度问题模型及算法[J];管理学报;2008年01期
10 马慧民;柳毅;叶春明;;基于改进粒子群算法求解单级多资源约束生产批量计划问题[J];工业工程与管理;2005年06期
相关博士学位论文 前10条
1 王宏亮;钢铁企业多粒度分型生产计划管理方法研究[D];大连理工大学;2011年
2 赵业清;基于多Agent的钢铁生产复杂物流系统建模与仿真研究[D];昆明理工大学;2011年
3 王大志;面向实际工程问题的粒子群优化算法应用技术的研究[D];东北大学;2009年
4 韩毅;离散制造业中生产批量计划问题的求解算法研究[D];东北大学;2009年
5 李磊;数字化产品预装配序列生成、评价与优化研究[D];西北工业大学;2002年
6 吉卫喜;面向业务流程重组的生产管理系统快速重构及其关键技术研究[D];南京航空航天大学;2002年
7 简炜;物流过程的建模和优化方法研究[D];浙江大学;2004年
8 袁锋;基于资源优化的制造过程建模与仿真研究[D];东北大学;2006年
9 黄波;基于Petri网的FMS建模与调度研究[D];南京理工大学;2006年
10 鞠全勇;智能制造系统生产计划与车间调度的研究[D];南京航空航天大学;2007年
本文编号:2383807
本文链接:https://www.wllwen.com/guanlilunwen/gongchengguanli/2383807.html