甘肃会展中心矩形钢管混凝土柱顶升技术
[Abstract]:Concrete filled rectangular steel tube (Liang Zhu) is used in Gansu Conference and Exhibition Center Project. Because the diameter of internal ribbed slab of column is only 200mm in the position of Liang Zhu joint of CFST composite section, it is very difficult to construct concrete-filled steel tube core and vibrating concrete. In view of the engineering difficulties, this paper puts forward the corresponding countermeasures, optimizes the mix ratio of the jacking and pouring concrete and controls the raw materials, and introduces in detail the construction technology, key technology and matters needing attention of the concrete jacking construction. The results show that the lifting technology accelerates the construction progress and reduces the safety risk.
【作者单位】: 中建一局集团第五建筑有限公司;甘肃电力投资集团云天酒店有限公司;
【分类号】:TU755
【相似文献】
相关期刊论文 前10条
1 蔡祖畅;;浅谈钢管混凝土柱在工程中的施工[J];科技风;2009年04期
2 鲍可庆;徐琳;徐柏林;;船体切割下料车间钢管混凝土柱的施工[J];工程与建设;2011年04期
3 李友战;项立升;;钢管砼结构中混凝土顶升施工技术[J];安装;2011年03期
4 李钟林;钢管混凝土柱核心混凝土泵送顶升施工[J];建筑技术;1998年01期
5 李政,刘福春;鞍钢全连铸钢管混凝土柱施工[J];施工技术;1999年08期
6 赵巨海,张凤敏;钢管混凝土柱泵送顶升混凝土施工技术[J];建筑技术;2001年02期
7 刘真 ,陈凯;钢管混凝土顶升浇筑施工工法(YJGF46-2000)[J];施工技术;2002年03期
8 ;钢管柱顶升浇筑混凝土施工[J];施工技术;1994年03期
9 杨振华;钢管混凝土柱顶升法浇筑[J];施工技术;1997年09期
10 张世余,刘家彪;马钢2500m~3高炉炉体框架钢管混凝土柱施工质量控制[J];安徽建筑;2000年02期
相关会议论文 前10条
1 陈麟海;王剑非;钟阳;;昆明中汇商业中心的结构设计[A];第二届全国钢结构施工技术交流会论文集[C];2008年
2 谷雅敏;;钢筋和钢管混凝土圆柱的工作性能与经济性比较[A];建设工程混凝土应用新技术[C];2009年
3 张全林;杨成臣;;钢管混凝土柱外加强环式节点有限元分析[A];建筑结构(2009·增刊)——第二届全国建筑结构技术交流会论文集[C];2009年
4 栾文彬;蒋应龙;;钢管混凝土柱预应力梁组合结构在南京斯维特大厦工程中的应用[A];第六届后张预应力学术交流会论文集[C];2000年
5 蔡健;黄泰,
本文编号:2178120
本文链接:https://www.wllwen.com/guanlilunwen/huizhanguanlilunwen/2178120.html