大型激光装置装校作业流程建模与仿真
[Abstract]:The large-scale laser device is a comprehensive high-tech engineering system which integrates laser, precision instrument, various optical-electromechanical control and computer control systems. The device is large in scale, complex in structure, and numerous in the number of components and devices. The complexity of the structure determines the complexity of the process. The process involves the evaluation of production capacity and efficiency, that is, under certain resource constraints and spatial constraints, the decision analysis and risk control of resource allocation, personnel scheduling and scheme selection are carried out. The process simulation of the research facility ensures that the plan is carried out according to scheduled time, resources and budget. In this paper, the background and research status of the whole device are summarized, and then the modeling and simulation methods, steps and significance of the calibration process of laser installation are introduced. Then, the installation process of the whole device is divided into layers according to the structure, and the system is modeled. The chip amplifier module of the main amplifier system is selected as the research object, the directed graph is extended, the definition of resource constraints is added, and the network diagram modeling of the calibration process is established. The graphic model is used to show the process of assembling and calibrating the module. On the basis of system modeling, using Flexsim logistics simulation software as the simulation platform, the simulation modeling example is verified, and the simulation results are compared with the actual situation. Based on JIT's just-in-time production mode, the different resource allocation is simulated under the given layout scheme, and the simulation results are compared and analyzed to verify the feasibility and analyze the installation efficiency. Finally, aiming at the practical problems, such as how to quickly modify the data and improve the efficiency of simulation, the data-driven simulation method is studied, and the user object entity model base and the database of assembly and calibration process are established. A preliminary simulation experiment is carried out in Flesim. The research results in this paper can provide certain technical support for the digital construction of laser device.
【学位授予单位】:华中科技大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TN249
【相似文献】
相关期刊论文 前10条
1 闫淑敏;法国兆焦耳激光装置获创记录激光能量[J];国外核新闻;2003年07期
2 李瑞琴;免调试固体激光装置[J];光机电信息;1999年10期
3 陈远斌,袁晓东,郭良福,张建波,王一菲,李冬梅,陈德怀,王晓东;40J激光装置研制[J];强激光与粒子束;2000年S2期
4 陈光宇;张小民;郑万国;游泳;唐小我;杨晓瑜;贺少勃;邵云飞;;甚多束激光装置满足到靶最小能量的可靠性分析[J];强激光与粒子束;2008年12期
5 彭翰生,张小民,范滇元,朱健强;高功率固体激光装置的发展与工程科学问题[J];中国工程科学;2001年03期
6 ;我国成功研制超强激光装置[J];电子产品可靠性与环境试验;2005年06期
7 陆泽;“天光2A”激光装置改造调研[J];中国原子能科学研究院年报;2003年00期
8 李思宁,程元丽,余祺琪,刘鹏,王骐;毛细管放电X光激光装置设计及分析[J];哈尔滨工业大学学报;2005年05期
9 刘鹏,王骐,杨大为;台式毛细管放电X光激光装置调试实验[J];激光技术;2002年01期
10 ;神光-Ⅲ激光装置建设项目取得重大阶段进展[J];强激光与粒子束;2011年07期
相关会议论文 前9条
1 王方;刘兰琴;莫磊;林东晖;王文义;粟敬钦;;高功率固体激光装置注入组合透镜公差分析和实验研究[A];第十八届十三省市光学学术会议论文集[C];2010年
2 陈清海;力一峥;郭良福;袁晓东;王成程;邓武;李炜;周丕璋;;激光装置新型能源系统技术改造[A];中国工程物理研究院科技年报(2003)[C];2003年
3 黄小军;彭翰生;魏晓峰;朱启华;王晓东;曾小明;周凯南;郭仪;刘兰琴;王逍;朱启华;林东晖;唐晓东;张小民;;百太瓦级超短超强钛宝石激光装置研制[A];中国工程物理研究院科技年报(2005)[C];2005年
4 黄小军;彭翰生;魏晓峰;王晓东;曾小明;周凯南;郭仪;刘兰琴;王逍;朱启华;林东晖;唐晓东;张小民;;百太瓦级超短超强钛宝石激光装置[A];中国工程物理研究院科技年报(2005)[C];2005年
5 杨维东;宋影松;金晶;栾永平;张绍池;;HF泛频化学激光装置实验[A];中国工程物理研究院科技年报(1998)[C];1998年
6 滕浩;马景龙;郑轶;葛绪雷;王兆华;李玉同;魏志义;;100TW/0.1Hz高重复频率激光装置[A];中国光学学会2011年学术大会摘要集[C];2011年
7 宋天明;杨家敏;朱托;陈涛;张文海;尚万里;易荣清;何小安;袁永腾;郭亮;孟广为;李敬宏;;不同X射线驱动下CH泡沫辐射输运实验研究[A];第十六届全国原子与分子物理学术会议论文摘要集[C];2011年
8 朱启华;谭吉春;张清泉;景峰;刘红婕;张小民;;用光线追迹法分解聚变用激光装置的稳定性[A];中国工程物理研究院科技年报(1999)[C];1999年
9 余有龙;曹雪;刘盛春;张金涛;;基于栅锥结合的新型可调谐全光纤激光装置[A];中国光学学会2006年学术大会论文摘要集[C];2006年
相关博士学位论文 前1条
1 杨菁;高功率固体激光装置的优化设计及综合评估方法研究[D];山东大学;2005年
相关硕士学位论文 前2条
1 汪霞;大型激光装置装校作业流程建模与仿真[D];华中科技大学;2015年
2 赵建印;激光装置能源系统可靠性研究[D];国防科学技术大学;2002年
,本文编号:2121860
本文链接:https://www.wllwen.com/guanlilunwen/wuliuguanlilunwen/2121860.html