军队工程项目集中代建模式研究
发布时间:2018-04-21 16:59
本文选题:军队工程 + 集中代建模式 ; 参考:《华中科技大学》2015年硕士论文
【摘要】:随着我国国力的不断增强,军队建设正处于良好的发展阶段,所承担的工程建设任务也日益繁重。与政府非盈利性投资项目相同,军队工程建设也面临着许多矛盾和问题,在传统工程建设管理模式下,逐渐暴露出很多弊端。军队于2013年颁布了关于实行工程代建制的管理办法,是军队工程建设领域的一项重大变革。但由于军队刚刚开始推行代建制,与之相关的法规机制和管理体制尚不完善。因此,深入研究军队工程项目代建管理模式成为一个亟待解决的问题,而判断军队推行工程代建制是否成功的关键就是能否建立起一套合理有效的管理绩效评价体系。本文首先通过分析军队工程项目管理模式的历史演变过程以及当前的现状,归纳总结出了当前军队工程项目管理存在的问题,然后结合军队工程建设实际,以政府集中代建项目实践为基础,展开对集中代建理论的研究,同时对军队实施工程项目集中代建进行必要性分析,分别从组织管理和体制两方面构建了军队工程项目集中代建模式,并对其运行机制进行了深入探讨。接着本文基于平衡计分卡方法,从五个维度选取了绩效评价指标,构建出军队工程项目集中代建绩效评价指标体系。最后运用层次分析法计算权重。本文的研究对推进我国军队工程项目代建制的实施,发展军队工程项目管理理论具有很好的借鉴作用。
[Abstract]:With the increasing of our country's national strength, the army construction is in a good stage of development, and the construction task is increasingly heavy. Similar to the government's non-profit investment projects, military engineering construction also faces many contradictions and problems. Under the traditional management mode of engineering construction, a lot of disadvantages are gradually exposed. In 2013, the army promulgated the management method of implementing the engineering agent system, which is a major change in the field of military engineering construction. However, as the army has just begun to implement the agent system, the related legal mechanism and management system are not perfect. Therefore, it is an urgent problem to study the management mode of military engineering project agent construction. The key to judge the success of military engineering agent system is to establish a set of reasonable and effective management performance evaluation system. By analyzing the historical evolution process and current situation of military engineering project management mode, this paper summarizes the problems existing in the current military engineering project management, and then combines with the military engineering construction practice. Based on the practice of centralized agent construction project by the government, the research on the theory of centralized agent construction is carried out. At the same time, the necessity of implementing centralized agent construction in military engineering project is analyzed. In this paper, the centralized agent construction model of military engineering project is constructed from the aspects of organization, management and system, and its operation mechanism is discussed in depth. Then, based on the balanced scorecard method, this paper selects the performance evaluation indicators from five dimensions, and constructs the performance evaluation index system of military engineering projects. Finally, analytic hierarchy process is used to calculate the weight. The research in this paper can be used for reference to promote the implementation of military engineering project agent system and to develop the theory of military engineering project management.
【学位授予单位】:华中科技大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:E23
【参考文献】
相关期刊论文 前9条
1 谭晶;;政府投资工程项目的代建制模式实践与探讨[J];经营管理者;2011年06期
2 崔跃;赵利;杨三超;;基于ANP的政府投资项目代建单位绩效考评体系研究[J];建筑经济;2009年S1期
3 张静;杨彦萍;;基于BSC的政府投资项目代建单位绩效评价指标体系研究[J];煤炭经济研究;2009年01期
4 南博;何国杰;杨铁军;冯跃洲;;建设项目管理代建制模式刍议[J];重庆建筑;2008年12期
5 郑玲燕;;传统财务绩效评价与平衡积分卡方法比较分析[J];现代商贸工业;2007年02期
6 周世玲;;贵州省政府投资工程代建制情况研究[J];建筑经济;2006年05期
7 李蕾,陈瑜;基于DEA方法的建设项目集成化管理绩效评价[J];武汉理工大学学报;2005年05期
8 黄霆,申立银,赵振宇,任志浩;我国政府投资项目管理的现状分析[J];建筑经济;2005年01期
9 蔡守华,周明耀,叶志才;工程项目管理效绩评估方法[J];扬州大学学报(自然科学版);2002年02期
相关硕士学位论文 前1条
1 杜乐江;市政公共设施委托代建工程项目管理机制研究[D];中国海洋大学;2009年
,本文编号:1783297
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/1783297.html