深圳政府工程集中管理模式下的造价管理
本文选题:政府工程 + 工程造价 ; 参考:《深圳大学》2017年硕士论文
【摘要】:改革开放以来,我国的社会经济迅速发展,政府投资在国民经济中所占的比重越来越大。政府资金的大量投入,其主要目的就是为了满足人民群众日常生活的需要、提高人民群众生活质量。随着市场经济的发展和经济体制改革的深入,我国政府也在不断探索新的政府投资项目管理模式,逐步引入专业化的项目管理机构对工程造价进行管理。工程造价管理最重要的内容,就是如何准确无误的计算好价格并且行之有效地控制好造价,客观并准确的反映出某个工程项目的价值量,然后围绕预定的造价目标行之有效去控制,在整个造价形成过程中要对产生的一切费用进行合理计算和合理的监控,并有相应的解决措施对可能出现的问题及时纠正。政府工程集中管理模式是非经营性政府项目常采用的方式,实践证明,我国引入专业化的项目管理机构在整个建设过程中造价控制发挥着巨大作用。本文对深圳政府集中管理模式下的造价管理研究,以造价控制为主线,灵活采用多种研究方法。首先分析了政府工程造价管理的有关概念以及国内外政府工程集中管理模式下的造价管理现状及特点;其次向设计院、施工单位、监理单位、造价咨询单位、政府工程管理等部门发放调查问卷回访的方式,收集不同角度的个体对此体系的看法,找出研究的必要性以及政府工程集中管理模式下的造价管理存在的问题;最后通过具体的工作实例提出完善的措施和对策。
[Abstract]:Since the reform and opening up, the social economy of our country has developed rapidly, and the proportion of government investment in the national economy is increasing. The main purpose of the massive investment of government funds is to meet the needs of people's daily life and to improve their quality of life. With the development of market economy and the deepening of economic system reform, our government is constantly exploring new government investment project management model, and gradually introducing specialized project management agencies to manage project cost. The most important content of project cost management is how to calculate the price correctly and control the cost effectively, and objectively and accurately reflect the value of a project. Then it can be effectively controlled around the predetermined cost target, and all the costs should be calculated and monitored reasonably in the whole process of cost formation, and there are corresponding solutions to correct the possible problems in time. The mode of centralized management of government projects is often adopted by non-profit-making government projects. It has been proved by practice that the introduction of specialized project management institutions plays a great role in cost control in the whole process of construction. This paper studies the cost management under the centralized management mode of Shenzhen government, takes the cost control as the main line, adopts many kinds of research methods flexibly. Firstly, this paper analyzes the concept of government project cost management and the current situation and characteristics of cost management under the mode of centralized government project management at home and abroad, secondly, to the design institute, construction unit, supervision unit, cost consulting unit, The way that the government project management and other departments distribute the questionnaire back to visit, collect the individual's view of this system from different angles, find out the necessity of the research and the problems existing in the cost management under the government project centralized management mode; Finally, the author puts forward the perfect measures and countermeasures through the concrete working examples.
【学位授予单位】:深圳大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TU723.3
【相似文献】
相关期刊论文 前10条
1 孙德宏;;清欠,要从政府工程做起[J];中国就业;2003年12期
2 曹攀;;当前政府工程招投标问题及其规范[J];广西城镇建设;2007年06期
3 何有山;周申蓓;;规范我国政府工程管理制度的对策研究[J];建筑经济;2007年07期
4 张艇;海智波;;政府工程中工程项目委托监管研究[J];山西建筑;2010年15期
5 李世蓉,徐波;对政府工程管理体制改革的思考——中外对比及建议[J];建筑经济;1999年07期
6 钱律;建议政府工程尽早实施政府采购制度[J];基建优化;2002年05期
7 高山;;政府工程招投标的主要风险与应对策略[J];商业经济;2012年21期
8 李俊;;美国政府工程施工质量管理[J];工程质量;2008年23期
9 吕炜;贺昌政;;政府工程多属性招投标博弈分析[J];重庆大学学报(社会科学版);2014年02期
10 高山;;我国政府工程代建制管理问题探讨[J];建筑经济;2014年03期
相关重要报纸文章 前10条
1 记者郑春波 通讯员郭衍成;十月底前还清政府工程拖欠款[N];中国建设报;2005年
2 王罡;要把创建“平安畅通县区”作为政府工程[N];陕西日报;2007年
3 吴睿鸫;解开“政府工程欠薪”这个结[N];工人日报;2013年
4 ;2013年2月房屋市政府工程生产安全事故情况[N];中国建设报;2013年
5 ;6月房屋市政府工程生产安全事故情况[N];中国建设报;2013年
6 本报记者 刘可 实习生 林旭;违规运渣土 政府工程多[N];北京日报;2014年
7 记者 叶前 苏晓洲 王圣志 冯雷 刘军 沈,
本文编号:1811245
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/1811245.html