基于和声搜索算法的船舶分段工程项目工期—成本优化
发布时间:2018-05-20 02:27
本文选题:船舶建造 + 工期—成本优化 ; 参考:《财会月刊》2015年18期
【摘要】:工期—成本优化是项目管理的重要内容,对工程项目经济效益的最大化起着至关重要的作用。针对船舶分段工程项目管理中的工期-成本管理问题,将工期-成本优化应用于船舶分段工程项目管理领域,结合船舶分段工程项目中工期-成本优化问题的特点建立数学模型,应用MATLAB软件对算法进行编程,通过实例数据,采用和声搜索算法求解,结果表明和声搜索算法可以比遗传算法(GA)更加有效地求解该类问题。
[Abstract]:Duration-cost optimization is an important part of project management and plays an important role in maximizing the economic benefits of engineering projects. Aiming at the problem of time-cost management in ship segmented engineering project management, the optimization of time-cost is applied to the field of ship segmented engineering project management. Combined with the characteristics of the time-cost optimization problem in the ship subsection engineering project, the mathematical model is established, and the algorithm is programmed by MATLAB software. The algorithm is solved by using the harmony search algorithm through the example data. The results show that the harmonic search algorithm is more effective than genetic algorithm (GA) in solving this kind of problems.
【作者单位】: 江苏科技大学经济管理学院;淮阴师范学院经济与管理学院;
【基金】:国家自然科学基金资助项目(项目编号:71203081) 教育部人文社科基金资助项目(项目编号:11YJA630151) 江苏省社科基金资助项目(项目编号:10GLB011)
【分类号】:F407.474;U673
【参考文献】
相关期刊论文 前1条
1 刘玉君;李瑞;o跆锇钤,
本文编号:1912799
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/1912799.html