当前位置:主页 > 管理论文 > 项目管理论文 >

江垭电站机电安装项目控制管理

发布时间:2018-06-01 02:25

  本文选题:招标采购 + 暂定金控制 ; 参考:《人民长江》2000年02期


【摘要】::江垭工程系部分利用世行贷款投资建设的国家重点工程。电站主要机电设备和材料均严格实行招投标。在积极推行“三大制度”的基础上 ,针对机电安装工程的特点 ,探索了新形势下适合中国国情的管理模式和管理方法 ,制定并实施了一整套较为完善的项目管理制度和办法 ,效果明显。 1998年底 1号机组具备发电条件 ,1999年 5月 1、2号机并网发电 ,取得了良好的社会效益和经济效益
[Abstract]:Jiangya Engineering Department, part of the use of World Bank loans to invest in the construction of the state key projects. The main mechanical and electrical equipment and materials of the power station are strictly implemented in bidding. On the basis of actively implementing the "three major systems" and in view of the characteristics of the mechanical and electrical installation projects, this paper explores the management models and management methods suitable for China's national conditions under the new situation. Developed and implemented a set of relatively perfect project management system and method, the effect is obvious. At the end of 1998, Unit No. 1 was equipped with the conditions for generating electricity, and the No. 1 and No. 2 generators were connected to grid power generation in May, 1999, and achieved good social and economic benefits.
【作者单位】: 澧水流域水利水电综合开发公司!湖南长沙410007 澧水流域水利水电综合开发公司!湖南长沙410007
【分类号】:TV734


本文编号:1962501

资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/1962501.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户b4bec***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com