珊溪水库工程建设概要
发布时间:2018-07-16 19:37
【摘要】:珊溪水库规模系大 (Ⅰ )型 ,大坝高 132 5m ,为国内在建钢筋混凝土面板堆石坝中第二高坝 ,1997年开工以来 ,经建设、设计、施工、监理等有关方面的努力 ,工程建设已取得了阶段性成果 ,工程质量评定暂定优良 ,并通过蓄水安全鉴定和蓄水阶段验收 ,2 0 0 0年 5月 12日下闸成功。 6月 12日水库水位达到最低发电水位 98m ,6月 2 8日首台 (4号 )机组并网发电 ,9月 2 8日第 2台 (3号 )机组并网发电。
[Abstract]:The scale of Shanxi reservoir is large (I) type, and the height of the dam is 132 5m. It is the second high dam in the construction of reinforced concrete face rockfill dam in China. Since 1997, the construction, design, construction, supervision and other related efforts have been made. In the water storage stage, the sluice was successful in May 12, 2000. In June 12th, the water level of the reservoir reached the minimum water level 98m, the first (No. 4) unit in June 28th was connected to the grid, and the second units (No. 3) in September 28th were connected to the grid.
【作者单位】: 珊溪水利枢纽工程总指挥部!浙江温州325304
【分类号】:TV632
本文编号:2127457
[Abstract]:The scale of Shanxi reservoir is large (I) type, and the height of the dam is 132 5m. It is the second high dam in the construction of reinforced concrete face rockfill dam in China. Since 1997, the construction, design, construction, supervision and other related efforts have been made. In the water storage stage, the sluice was successful in May 12, 2000. In June 12th, the water level of the reservoir reached the minimum water level 98m, the first (No. 4) unit in June 28th was connected to the grid, and the second units (No. 3) in September 28th were connected to the grid.
【作者单位】: 珊溪水利枢纽工程总指挥部!浙江温州325304
【分类号】:TV632
【相似文献】
相关期刊论文 前10条
1 陈新乐;珊溪水库泄洪洞钢衬制作[J];水电站机电技术;1999年02期
2 林泽强;珊溪水库工程建设概要[J];水力发电;2000年10期
3 吴垂涛;优质高效建设珊溪水库工程[J];水力发电;2000年10期
4 陈泽鑫;珊溪水库工程施工管理[J];水力发电;2000年10期
5 陈振文;珊溪水库工程枢纽总布置[J];水力发电;2000年10期
6 徐跃明;珊溪水库泄洪洞设计[J];水力发电;2000年10期
7 应宁坚;珊溪水库面板堆石坝施工及其特点[J];水力发电;2000年10期
8 李中方;珊溪水库工程开挖爆破施工[J];水力发电;2000年10期
9 陈文明,周清水;珊溪混凝土面板堆石坝垫层料生产与填筑[J];水力发电;2000年10期
10 应宁坚,朱丽萍;珊溪水库面板堆石坝施工渡汛保护方案浅析[J];水力发电;2000年10期