军用XX基础研发条件建设项目进度管理研究
[Abstract]:The fixed assets investment projects of national defense science, technology and industry have the characteristics of large scale of project investment, long construction period, complicated construction contents and great investment significance. It is objectively required that the project construction should proceed from the goal of construction. In order to ensure the progress and quality of the project, we should plan the project construction plan scientifically and reasonably, strengthen the implementation management of the construction safety project in the process of construction, manage the equipment purchase, strictly manage the project schedule, and ensure the progress and quality of the project construction. The military XX basic R & D condition construction project is the national defense science and technology industry fixed assets investment project, in the project implementation process, the progress management system is not perfect, the schedule management importance understanding is insufficient, the schedule management scientific nature needs to be improved, Lack of full-time progress control personnel, the project implementation schedule delay, the project on time to complete a greater impact, therefore, it is necessary to XX project progress management research, and has very important significance. Based on the research on the theory of project management and project schedule management, this paper has carried on the WBS decomposition to XX project and carried on the thorough research to the activity logic relation, has used the network plan technology, the key path method and so on method. The project schedule is compiled and optimized. Secondly, how to monitor the project schedule dynamically and how to adjust the project schedule during the implementation of the project schedule are analyzed in detail. This paper puts forward the measures to control the project schedule, and also puts forward the relevant safeguard measures to ensure the implementation of the project schedule plan. Through the research of this paper, combining the theory and method of project management with the actual situation of military XX basic R & D condition construction project schedule management, it has important theoretical and practical significance for the formulation and control of XX project schedule. Through this research, we can also provide reference and reference for the schedule management of other fixed assets projects of defense science, technology and industry.
【学位授予单位】:南京理工大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:E25;F426.48
【相似文献】
相关期刊论文 前1条
1 沈金;IT项目进度管理[J];台声.新视角;2005年05期
相关会议论文 前3条
1 杨正茂;;维生素C质量升级项目进度管理研究[A];第十届沈阳科学学术年会论文集(农业科学与医药科学分册)[C];2013年
2 高华北;张花玲;周湘晖;黄曦;丁霞;王丽;鄢旭辉;严国兴;;甘特图在职业病危害评价项目进度管理中的应用[A];湖南省预防医学会劳动卫生专业委员会2008年学术交流会议论文集[C];2008年
3 孙慧;王丽华;;多层次模糊控制在工程项目进度管理中的应用[A];2005年中国机械工程学会年会论文集[C];2005年
相关重要报纸文章 前7条
1 彭洁;昆明办审计项目进度管理实现规范化[N];中国审计报;2013年
2 ;辽宁审计厅出台审计项目进度管理办法[N];财会信报;2010年
3 曹忻;云南省审计厅实行项目进度管理[N];中国审计报;2010年
4 项荣;深圳办加强审计项目进度管理[N];中国审计报;2012年
5 小城;辽宁出台审计项目进度管理办法[N];中国税务报;2010年
6 记者 李颖;增强藏区自我造血能力 助推藏区跨越发展[N];成都日报;2014年
7 通讯员 刘永良;双永高速永定段完成投资15亿元[N];闽西日报;2010年
相关博士学位论文 前3条
1 薛维锐;面向协同施工的工程项目进度管理研究[D];哈尔滨工业大学;2015年
2 魏从刚;网络化协同制造项目进度管理技术研究[D];西北工业大学;2006年
3 张敏;项目进度管理的行为不确定性及其控制策略研究[D];华中科技大学;2011年
相关硕士学位论文 前10条
1 秦国祥;HP公司软件项目进度管理研究[D];华东理工大学;2015年
2 廖奇;嘎纳时代广场工程项目进度管理研究[D];电子科技大学;2015年
3 公为伟;烟台丰源矿产公司矿粉生产厂区建设项目进度管理研究[D];中国海洋大学;2015年
4 包杨川;关键链管理在W工程项目进度管理中的运用研究[D];电子科技大学;2015年
5 赵清华;潍坊市高新花园住宅小区建设项目进度管理研究[D];中国海洋大学;2014年
6 王续鹏;QDPJ集团视频信息交互系统项目进度管理研究[D];中国海洋大学;2014年
7 黄忠祥;MS移动4G深度覆盖工程项目进度管理研究[D];电子科技大学;2015年
8 李谧;A企业数字电气平台项目进度管理研究[D];电子科技大学;2015年
9 杨雯婷;集成开发管理中项目进度管理的模型研究[D];大连海事大学;2015年
10 高冉;A公司新产品开发多项目进度管理优化研究[D];浙江工业大学;2015年
,本文编号:2157169
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2157169.html