基于关键链技术的地铁工程A项目进度管理研究
[Abstract]:In the field of subway project management, project schedule management is a very important branch, it is an important measure of subway project management. In the traditional subway project schedule management mode, there are some artificial factors, such as student syndrome, Parkinson's law and so on. This will prolong the estimated duration of the project and lead to delays in the project. The key chain management technology can greatly improve this situation, effectively make up for some problems in the traditional subway project schedule management method, so it is necessary for us to study the key chain technology deeply. This is of great significance to subway project management. This article mainly through the literature analysis and so on many methods launches the discussion. Firstly, this paper reviews the traditional theory and method of project schedule management, and briefly combs the existing problems, and then leads to the key chain technology and its theory. Secondly, the basic theory and thought of the key chain, its basic content and how to use it are expounded, and the differences between the key chain technology and the traditional project schedule management methods and their advantages are compared and analyzed. Thirdly, the paper discusses and analyzes the identification of key chain, the setting and management of buffer zone, and constructs the optimization model of subway project schedule management based on key chain. In this model, the complexity and resource constraint of subway project are comprehensively considered in the setting of import buffer zone, and the principal component analysis method is put forward, which can be used to distribute buffer amount and set up buffer zone after non-critical work. This is beneficial to the progress control of the project, which leads to the effective solution of the critical chain breakage and the great improvement of the input buffer setting, which makes it more scientific. Finally, through the introduction of A subway project case, the paper plans to adopt the traditional project schedule management method and key chain technology to formulate the project schedule management plan, and analyzes and compares the results of the two methods in depth. Through the analysis of examples, it is verified that the proposed method of importing buffer is more stable and feasible, and the key chain schedule management model can fully ensure the schedule management of the whole project. Can greatly reduce the duration of the project. Through the comparison of examples, it is proved that the advantages of the key chain management technology are as follows: (1) on the one hand, the conflict of resources is analyzed, on the other hand, the constraints of tight relationship are also taken into account; (2) the constraints and bottlenecks of resources are identified, which is beneficial to the optimal allocation of resources in the process of the project. In order to reduce the risk of progress caused by resource problems, (3) to ensure the smooth progress of the project, buffer zones are set up. The related research in this paper has further improved the project knowledge management system, which is helpful to the further improvement of the project management level, so it has strong practical significance.
【学位授予单位】:北京工业大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:U231.3
【相似文献】
相关期刊论文 前10条
1 韩文民;谢聪利;宁宣熙;;关键链在资源受限中的应用研究[J];中国制造业信息化;2007年23期
2 郭庆军;李慧民;赛云秀;;多项目关键链进度优化算法分析[J];工业工程与管理;2008年06期
3 李俊亭;王润孝;杨云涛;;基于资源冲突调度的关键链项目进度研究[J];西北工业大学学报;2010年04期
4 钟稳;廖良才;;多项目进度瓶颈——关键链束[J];科学技术与工程;2011年25期
5 赵道致,廖华;对关键链法的几个认识误区[J];工业工程;2005年02期
6 姜华;刘建峰;;基于关键链方法的船舶分段制造计划系统研究[J];上海造船;2008年03期
7 田文迪;崔南方;;关键链项目管理中关键链和非关键链的识别[J];工业工程与管理;2009年02期
8 陈友玲;张晓丽;覃承海;;基于关键链的多项目计划编制[J];计算机集成制造系统;2009年07期
9 程文攻;陈勇;;基于关键链的施工计划与排程应用[J];建筑经济;2011年04期
10 郭旭;;关键链方法的研究与应用[J];硅谷;2011年20期
相关会议论文 前4条
1 蒋国萍;陈英武;;基于关键链的项目进度问题研究[A];中国运筹学会第七届学术交流会论文集(中卷)[C];2004年
2 徐阳;;试用关键链理论组织预测市场需求[A];上海市烟草专卖局2007年度获奖论文集(经济管理类)[C];2007年
3 周正龙;董雄报;左园;;MIS开发项目进度管理的关键链识别研究[A];第八届(2013)中国管理学年会——管理与决策科学分会场论文集[C];2013年
4 万伟;蔡晨;;在两资源约束项目环境中的关键链管理[A];2003年中国管理科学学术会议论文集[C];2003年
相关重要报纸文章 前1条
1 路长全;速度领先导致资源汇聚[N];中国证券报;2007年
相关博士学位论文 前7条
1 林晶晶;考虑资源可替代性的关键链识别与缓冲设置方法研究[D];西南交通大学;2011年
2 郭方铭;基于粒子群优化和关键链的多项目计划管理问题研究[D];华中科技大学;2010年
3 别黎;关键链项目管理中缓冲估计与监控方法研究[D];华中科技大学;2012年
4 金敏力;基于关键链的项目优化调度问题研究[D];哈尔滨工业大学;2013年
5 田文迪;随机DTRTP环境下项目调度策略的比较研究[D];华中科技大学;2011年
6 刘英杰;大型水利工程费用/进度集成控制研究[D];天津大学;2012年
7 赵雁;时间缓冲设置与鲁棒性项目调度[D];华中科技大学;2014年
相关硕士学位论文 前10条
1 唐艺轩;基于关键链的工程进度与成本集成管理研究[D];山东建筑大学;2015年
2 刘博;基于多项目优先级的关键链识别和缓冲区设置研究[D];河北工程大学;2015年
3 李力真;空间受限大型复杂项目的关键链管理研究[D];兰州大学;2015年
4 殷蕊;基于关键链技术的多资源多项目进度控制研究与应用[D];沈阳大学;2015年
5 任格叶;关键链的随机性及其应用研究[D];西安建筑科技大学;2015年
6 韩家宁;基于关键链的船舶机舱系泊计划进度研究[D];上海交通大学;2015年
7 李恩成;基于关键链技术的工程建筑项目进度管理方法研究[D];华北电力大学;2015年
8 崔爽;基于关键链技术资源约束下项目调度应用研究[D];华北电力大学;2015年
9 玉树伟;基于关键链法的超高层项目施工进度管理研究[D];广西大学;2015年
10 蒙唐媛怡;基于灰色关键链的项目进度管理研究[D];北京化工大学;2015年
,本文编号:2160747
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2160747.html