SY-LM公司R监控系统研制项目进度计划与控制研究
[Abstract]:This paper focuses on R monitoring system project schedule management method and practice. Based on the basic principles of project schedule planning and project schedule control, this paper expounds the problems existing in the project management of aviation R & D and manufacturing enterprises, the main performance and the requirements of new product R & D for project schedule management, and clarifies the scientific significance of the research. The research idea of plan-tracking-schedule change is put forward. The major contents of this paper include the following aspects: (1) this paper analyzes the background, objectives and other basic conditions of R monitoring system project, discusses the project organization structure, on the basis of this, Further investigation and analysis of the project schedule delay. At the same time, combined with the background of the project development and the actual development needs, this paper establishes the objective requirements of project schedule management. Therefore, this paper points out the direction and goal for the continuous improvement of R monitoring system project schedule planning and control. (2) this paper starts from the theoretical research of project schedule management and combines with the actual operation of R monitoring system project. By comparing the experiences and lessons of the relevant projects at home and abroad in the process of development, the theories, techniques and methods of project management are studied and explored to optimize the project schedule. The project schedule control system of R monitoring system is established. (3) under the condition of fully considering the status of project resources, we proceed from the constraints and consistency of production, matching, quality control, process preparation and so on. The project schedule control system of R monitoring system is established. Starting with R & D project, the project is decomposed and responsibility assigned, followed the research project development process, the WBS decomposition, schedule planning, operation analysis and optimization of the project. Through the research in this paper, we can further improve the level of project management and provide the theoretical basis and practical experience for the R & D management of similar products. It is beneficial to improve the level of project schedule management and market competitiveness of enterprises, and also provide some ideas and references for the enterprise to follow up the project schedule management.
【学位授予单位】:东北大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TP277
【相似文献】
相关期刊论文 前4条
1 宇德明;郭乃正;罗鹏宇;;模拟软件SIMPHONY在科研项目进度计划中的应用[J];铁道科学与工程学报;2011年03期
2 李俊亭;杨睿娟;;关键链多项目进度计划优化[J];计算机集成制造系统;2013年03期
3 张丽君;赵俊岚;郭树行;;IT项目进度计划风险量化预测方法[J];计算机系统应用;2013年12期
4 ;[J];;年期
相关会议论文 前3条
1 李宏信;董秀伟;张玉;;浅谈项目进度计划制定及管理[A];第九届河南省汽车工程技术研讨会论文集[C];2012年
2 余钦墅;;浅谈测绘项目进度计划管理[A];浙江测绘(2012第2期总第111期)[C];2012年
3 李健民;夏松林;;基于MONTE-CARLO模拟的项目进度计划风险评估[A];中国海洋石油总公司第三届海洋工程技术年会论文集[C];2012年
相关重要报纸文章 前3条
1 本报评论员;咬定目标不松劲[N];益阳日报;2009年
2 记者 工力;我市加快重点工程建设步伐[N];临汾日报;2011年
3 记者 刘艳 通讯员 李春妮;翔安隧道今年将开挖2000米[N];厦门日报;2006年
相关博士学位论文 前1条
1 章勇武;高速公路建设工程进度的柔性化管理研究[D];同济大学;2005年
相关硕士学位论文 前10条
1 刘婷;某油田25-1生活楼项目进度计划研究[D];吉林大学;2014年
2 孙盛楠;环保学院新校区综合楼项目进度计划编制与控制研究[D];燕山大学;2015年
3 王进会;施耐德数据中心产品研发项目进度计划与控制[D];上海交通大学;2015年
4 付恩莉;戚机公司泰车研制项目进度计划与控制研究[D];大连理工大学;2015年
5 郭志卫;M公司转向节生产建设项目进度计划与控制[D];大连理工大学;2015年
6 陈磊;人力资源约束下某建筑工程项目进度计划研究[D];电子科技大学;2015年
7 张伟;轿车底盘耦合杆国产化项目进度计划管理[D];上海交通大学;2014年
8 苏奔;高层建筑灭火系统研发项目进度计划制定研究[D];北京工业大学;2015年
9 张亚妮;XX公司研发项目进度计划与控制改进研究[D];电子科技大学;2014年
10 邱柏榕;LA项目进度计划的研究[D];华南理工大学;2015年
,本文编号:2175532
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2175532.html