山东半岛蓝色经济工程研究院建设项目风险管理研究
[Abstract]:Construction projects have the characteristics of long period, large investment, complex construction technology, more participants, more environmental interference, and so on. The engineering projects inevitably face many uncertain risks, such as not to prevent them. It is very likely to affect the smooth construction and operation of the project, and even cause incalculable losses. Identify the existing risks in advance, through careful analysis, seek a scientific management method, pay the minimum to reduce the project risk to the lowest limit, through the project risk management research, the project risk loss can be effectively avoided and reduced. It is of great significance to ensure the smooth completion of the project plan to achieve the expected economic, social and environmental benefits of the project. Risk management, as a systematic management process and management activity, is an essential and important link in engineering project management. The significance of strengthening risk management lies in making clear to the maximum extent the risk and the degree of risk existing in the project through risk identification, risk analysis, risk evaluation, and the potential uncertainty risk in the construction and operation of the project. The aim is to minimize risk by seeking effective control measures. This study takes the construction project of the Blue Economic Engineering Research Institute of Shandong Peninsula as the research object, and applies the theory and method of risk management to identify, analyze and evaluate the risks existing in the project. The countermeasures to avoid and control the risk are worked out so that the potential risk of the project can be effectively circumvented and the risk loss will be reduced to the minimum. Firstly, the theory and method of risk management in the field of engineering project are systematically expounded on the basis of reading relevant documents. Combined with the actual situation of the construction project of Blue Economic Engineering Research Institute of Shandong Peninsula, according to the research goal of risk management of the entity engineering project, the research framework is drawn up, and the possible risks in the preparation and construction of the project are identified and analyzed. And using the comprehensive evaluation index system, using analytic hierarchy process, flow chart, decomposition analysis, verification table method, accident tree analysis and other research methods, The paper evaluates the investment decision stage, the early stage of the project, the project construction stage and the project management stage of the Blue Economic Engineering Research Institute of Shandong Peninsula, with emphasis on the financing risk. The single risk evaluation and overall risk evaluation of engineering project are carried out in three aspects of management risk and quality risk. The related data of the construction project risk of Blue Economic Engineering Research Institute of Shandong Peninsula were investigated in advance, and then the risk of the project was evaluated quantitatively to determine the risk level of the project and lay the foundation for the risk control of the project. The results show that the risk values of the project in financing, management, quality and the whole project are 51.3 / 52.9 / 42.9 and 48.7, respectively. It is concluded that the construction project of the Blue Economic Engineering Research Institute of Shandong Peninsula has moderate risk and is within the scope of avoidance and control. In view of different stages, we should strengthen the analysis of relevant policies, adopt a variety of ways to combine to resolve the risk of land demolition and relocation, develop multiple financing, resolve financing risks, strengthen project management, control cost risks, strengthen project supervision and control quality risks. Through a series of measures, the risks in all aspects of the project should be reduced to a lower and lower degree, and special attention should be paid to project management and financing risks in order to prevent their impact on the whole project construction.
【学位授予单位】:中国海洋大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TU71
【参考文献】
相关期刊论文 前10条
1 冀巨海;梁微;;基于ISM模型的煤矸石电厂项目风险因素分析[J];科技和产业;2011年12期
2 郝风田;赵平;;基于可靠度理论的地铁施工项目风险控制研究[J];地下空间与工程学报;2011年02期
3 文海鸥;;浅析国际工程项目风险管理[J];中小企业管理与科技(下旬刊);2011年03期
4 金鑫;郭建男;王慧斌;李振宇;;工程监理项目中的风险管理[J];中国高新技术企业;2010年16期
5 王蔚初;;现代工程项目风险分析和管理[J];江西建材;2010年01期
6 文向阳;刘懿帆;;工程项目风险的管理过程及防范措施[J];现代经济信息;2009年23期
7 王煜洲;;基于物元分析的公路客运站建设风险评估[J];铁道运输与经济;2009年08期
8 彭伟功;周继军;向晓东;李春光;;可靠性理论在公共安全领域的应用研究[J];中国安全科学学报;2009年04期
9 刘振奎;;工程建设项目业主风险评估[J];价值工程;2008年02期
10 刘明菲;罗显敏;;物流园区市场运营风险管理[J];武汉理工大学学报(社会科学版);2006年03期
相关硕士学位论文 前8条
1 胡雄;武汉CBD综合管沟项目风险管理研究[D];华中科技大学;2007年
2 吴俊;建设项目前期管理中的风险管理研究[D];重庆大学;2007年
3 何九会;建设工程项目风险管理的研究[D];西安建筑科技大学;2007年
4 沈姗姗;物流园区的选址风险分析[D];武汉理工大学;2006年
5 洪柱;项目融资风险问题分析[D];武汉科技大学;2006年
6 杨亚岐;BOT项目融资的风险管理研究[D];燕山大学;2006年
7 冉启英;房地产投资风险管理研究[D];新疆农业大学;2004年
8 张墨林;房地产项目前期风险管理[D];西安建筑科技大学;2004年
,本文编号:2237667
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2237667.html