青藏交直流联网工程项目全过程管理体系研究
[Abstract]:The Qinghai-Tibet AC / DC network project is a key project in the "12th Five-Year Plan" of the country. It is the highest elevation in the world so far, the largest construction scale in alpine areas, the longest crossing of permafrost and the most difficult power transmission and transformation projects. Known as the Qinghai-Tibet Plateau on the "power sky road." In order to build the Qinghai-Tibet AC / DC network project and improve the management level of the power grid project, this paper makes a study. Taking the Qinghai-Tibet AC / DC network project as the research carrier and how to use the project management means in the construction and development of power grid engineering as the core content, this paper studies the project management situation at home and abroad, and analyzes the theory of project management and the whole process management of the project. The concept and scientific methods of modern project management are brought into practice, the requirements of the project are fully identified, the project objectives are clearly defined, and the whole project life cycle is divided into start-up stage, planning stage, implementation stage and closing stage. The whole process management system of the Qinghai-Tibet AC / DC interconnection project is established. In the whole process of project management, according to the principles of adaptability, feasibility, science and innovation, define the scope of the project, comprehensively coordinate the project progress, quality, investment, environmental protection and other objectives, quality management model guide, continuous improvement, Schedule management grasps the key path, develops the construction battle, strictly controls the design change, strictly controls the project scope, ensures the largest degree to meet the investor's demand, finally realizes the engineering project the whole process science, the standard management. The results of this paper have important theoretical and practical significance for improving the management level of transmission and transformation projects.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TM73
【相似文献】
相关期刊论文 前10条
1 ;青藏750千伏交直流联网工程将创多项世界之最[J];青海电力;2010年03期
2 祁正吉;党亚利;冯义华;;“电力天路”——青海—西藏750千伏/±400千伏交直流联网工程[J];农电管理;2011年02期
3 ;青藏交直流联网工程建设取得重要阶段性胜利[J];东北电力技术;2011年01期
4 鲁先龙;童瑞铭;;青藏交直流联网工程装配式基础抗压性能试验[J];电力建设;2011年05期
5 索朗多吉;;爱心送给西藏公司驻村工作点小学生[J];农村电工;2012年08期
6 宋涛;李斌;樊纪超;余世峰;;青藏交直流联网工程项目管理案例[J];项目管理技术;2012年05期
7 许鹏;张满定;;致敬! 向青藏高原上的英雄[J];国家电网;2011年02期
8 ;国家电网公司大力推进青藏交直流联网工程建设[J];陕西电力;2011年02期
9 ;青藏交直流联网工程西藏段首基铁塔组立[J];陕西电力;2011年03期
10 ;简讯[J];中国电力企业管理;2011年23期
相关重要报纸文章 前10条
1 马旭升;青藏交直流联网工程第一个基础浇筑工程完工[N];青海日报;2010年
2 记者 李莎莎;青海-西藏750千伏/±400千伏交直流联网工程开工[N];格尔木日报;2010年
3 记者 田丽;三级医疗保障确保青藏交直流联网建设大军战斗力[N];西藏日报;2010年
4 记者 星子;青藏交直流联网工程积极稳步推进[N];青海日报;2010年
5 记者 田丽;专家组检查青藏交直流联网工程西藏段环保情况[N];西藏日报;2010年
6 记者 王建芳 通讯员 张满定;青藏交直流联网工程打响世界冻土桩基攻坚战[N];格尔木日报;2010年
7 记者 星子;青藏交直流联网工程直流线路(青海段)基础施工暨热棒安装全面完工[N];青海日报;2010年
8 记者 陆畅 李海成;确保青藏交直流联网工程年内投运[N];国家电网报;2011年
9 记者 贾明;青藏交直流联网工程进行建设总动员[N];青海日报;2011年
10 记者 毛翠香;青藏交直流联网工程顺利转入架线阶段[N];青海日报;2011年
相关硕士学位论文 前1条
1 李斌;青藏交直流联网工程项目全过程管理体系研究[D];华北电力大学;2015年
,本文编号:2255675