市政燃气工程项目进度管理研究
[Abstract]:With the rapid development of China's economy, the environmental deterioration is becoming more and more serious. In 2012, the Ministry of Environmental Protection brought the PM2.5 standard into the "Environmental Air quality Standard", forcing local government departments to put environmental protection issues on the agenda. As a high-calorific environmental energy, natural gas is widely used by local governments. The construction of gas pipeline project has also entered the construction period in full swing. However, the construction management of urban gas engineering is still in the way of headquarters, which can not effectively control the progress of municipal gas pipeline construction. Municipal gas pipeline project schedule control has been puzzling the gas operating units and construction units. The reasonable and effective control and management of the progress of the gas engineering project is conducive to giving full play to the input-output ratio of the investors as soon as possible, to the good maintenance of the economic order and to the improvement of the benefit of the enterprise. By analyzing the progress control of municipal natural gas pipeline construction in an industrial park, this paper provides a template for finding out the main reasons that affect the progress of the project. In the process of project construction, the urban gas operation unit can find out the main factors that affect the progress of the project and take effective measures in time. For people to further understand the gas project schedule management and other related knowledge, project managers can effectively control the progress of municipal gas pipeline construction has a great reference value and guiding significance. This paper takes the municipal natural gas pipeline project of a certain industrial park as the research object, adopts the WBS project decomposition method, carries on the layer by layer decomposition to the municipal gas pipeline project construction project, decomposes the project into the construction drawing design, the material equipment purchase, The 19 steps of project construction, acceptance and so on. The Gantt chart of construction schedule is compiled with MICROSOFT PROJECT software for each subproject, and the schedule of each construction section or construction procedure is planned in detail. According to the factors existing in the construction process of municipal gas pipeline engineering, the factors affecting the construction progress are found out according to the Gantt diagram of the schedule plan. The number of factors affecting construction progress is counted, six main factors affecting the progress of municipal gas pipeline project are determined by ABC classification, and the key factors influencing construction progress are analyzed in combination with actual projects. From the aspects of project schedule management control procedure, project planning implementation, active participation in design, communication and coordination management with relevant parties, the best solution for each factor is obtained. It provides an optimal model for the construction progress control of municipal gas pipeline engineering. Through the effective control of the progress of the municipal gas pipeline project, the management of the project can be realized in all directions and the whole process can be controlled, so that all the objectives of the construction project can be achieved smoothly, the construction period is optimal, and the cost can be saved. Improve efficiency and enhance the competitiveness of enterprises.
【学位授予单位】:华南理工大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TU996;TU722
【相似文献】
相关期刊论文 前10条
1 梁礼方;;项目进度管理(下)[J];金融科技时代;2013年10期
2 刘耕,王学军;国内外项目进度管理的比较及建议[J];重庆交通学院学报;2003年S1期
3 章勇武,尤建新,黄力 ,马国丰;高速公路项目进度管理信息系统设计研究[J];上海管理科学;2005年05期
4 田丰春;;项目进度管理研究[J];中国科技信息;2008年14期
5 聂淑萍;高建民;;项目进度管理在国防科研项目管理中的应用探析[J];国防技术基础;2008年07期
6 刘晓东;;基于知识管理的工程项目进度管理持续改进研究[J];建筑经济;2009年05期
7 林进峰;;工程项目进度管理[J];广东建材;2009年11期
8 杨红霞;;项目进度管理方法研究[J];山西建筑;2010年29期
9 杜建峰;江文杰;;项目进度管理在公路施工建设中的意义及应用[J];中国新技术新产品;2010年21期
10 杨振鹏;;工程项目进度管理相关问题探讨[J];东北水利水电;2011年12期
相关会议论文 前3条
1 杨正茂;;维生素C质量升级项目进度管理研究[A];第十届沈阳科学学术年会论文集(农业科学与医药科学分册)[C];2013年
2 高华北;张花玲;周湘晖;黄曦;丁霞;王丽;鄢旭辉;严国兴;;甘特图在职业病危害评价项目进度管理中的应用[A];湖南省预防医学会劳动卫生专业委员会2008年学术交流会议论文集[C];2008年
3 孙慧;王丽华;;多层次模糊控制在工程项目进度管理中的应用[A];2005年中国机械工程学会年会论文集[C];2005年
相关重要报纸文章 前7条
1 彭洁;昆明办审计项目进度管理实现规范化[N];中国审计报;2013年
2 ;辽宁审计厅出台审计项目进度管理办法[N];财会信报;2010年
3 曹忻;云南省审计厅实行项目进度管理[N];中国审计报;2010年
4 项荣;深圳办加强审计项目进度管理[N];中国审计报;2012年
5 小城;辽宁出台审计项目进度管理办法[N];中国税务报;2010年
6 记者 李颖;增强藏区自我造血能力 助推藏区跨越发展[N];成都日报;2014年
7 通讯员 刘永良;双永高速永定段完成投资15亿元[N];闽西日报;2010年
相关博士学位论文 前2条
1 魏从刚;网络化协同制造项目进度管理技术研究[D];西北工业大学;2006年
2 张敏;项目进度管理的行为不确定性及其控制策略研究[D];华中科技大学;2011年
,本文编号:2339740
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2339740.html