DDH泵站安标改造项目进度计划与控制研究
[Abstract]:As a subsidiary enterprise of drainage company specializing in drainage operation, Zhuer Transportation Branch has always aimed to improve the safety level of production site of drainage pump station, enhance the safety culture atmosphere, and enhance the flood prevention and security ability of the enterprise. Increasing the pumping station site equipment and working environment safety investment. The reform of safety standardization emphasizes that people, machines, environment and management are in a safe state in the process of production and conform to the safety standards stipulated in the safety standardization norms. And through the mandatory review of the National Security Administration and obtained the corresponding level of qualifications. For the newly built DDH pumping station, Zhuer Transportation Branch will carry out safety standardization transformation. The main research contents of this paper are as follows: (1) the background of DDH pump station safety standard reconstruction project is studied and combed, and the reconstruction contents and related work of safety facilities, pump station environment and so on are discussed in order to realize the project goal. The organizational division of labor and related technical schemes are clarified. (2) the project tasks are structured and sorted, the task time is estimated, and the overall progress plan is made by using Gantt chart, network diagram, milestone plan, etc. On this basis, the progress plan of the project is optimized from the aspects of sound organization and management, rational allocation of resources and improvement of the implementation plan. (3) the problems that may affect the implementation of the progress plan in the reconstruction project of DDH pumping station safety standard are discussed. Including the project schedule deviation and work content change and so on carries on the analysis. Through the research of this paper, the control procedures and measures to ensure the effective implementation of the progress plan are summarized, and the problems that can be further studied are put forward. It plays a good demonstration significance for the implementation schedule and control of large-scale comprehensive pumping station safety standardization reconstruction project by using the project management theory scientifically and reasonably.
【学位授予单位】:东北大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TV511
【相似文献】
相关期刊论文 前10条
1 赵道致,廖华;遗传算法在项目进度计划中的应用[J];工业工程与管理;2004年06期
2 熊焕淮,杨振华;监理如何审查和调整多标段工程项目进度计划[J];江西水利科技;2002年S1期
3 柯畅;;蒙特卡罗仿真在制定项目进度计划中的应用[J];机电技术;2011年01期
4 张春生;严广乐;;基于设计结构矩阵的项目进度计划模型研究[J];科技与管理;2012年03期
5 李立一;;工程项目进度计划的实施与调整[J];大众科技;2013年05期
6 郭云涛;白思俊;万小兵;;基于DSM的项目成组管理模式的研究[J];工业工程;2007年04期
7 邱威;;项目进度计划动态管理模式在南京保障房项目施工中的应用[J];经营管理者;2013年11期
8 蒋根谋;一种新的线性工程项目进度计划的编制方法[J];铁道建筑;2005年11期
9 林军;刘朝辉;沈志刚;;一种资源约束下的工程项目进度计划优化方法[J];工程建设与设计;2006年11期
10 乔志佳;;浅谈工程项目进度计划制定与优化──以YJL住宅小区工程项目为例[J];行政事业资产与财务;2013年20期
相关会议论文 前3条
1 李宏信;董秀伟;张玉;;浅谈项目进度计划制定及管理[A];第九届河南省汽车工程技术研讨会论文集[C];2012年
2 余钦墅;;浅谈测绘项目进度计划管理[A];浙江测绘(2012第2期总第111期)[C];2012年
3 李健民;夏松林;;基于MONTE-CARLO模拟的项目进度计划风险评估[A];中国海洋石油总公司第三届海洋工程技术年会论文集[C];2012年
相关重要报纸文章 前3条
1 本报评论员;咬定目标不松劲[N];益阳日报;2009年
2 记者 工力;我市加快重点工程建设步伐[N];临汾日报;2011年
3 记者 刘艳 通讯员 李春妮;翔安隧道今年将开挖2000米[N];厦门日报;2006年
相关博士学位论文 前1条
1 章勇武;高速公路建设工程进度的柔性化管理研究[D];同济大学;2005年
相关硕士学位论文 前10条
1 刘婷;某油田25-1生活楼项目进度计划研究[D];吉林大学;2014年
2 孙盛楠;环保学院新校区综合楼项目进度计划编制与控制研究[D];燕山大学;2015年
3 王进会;施耐德数据中心产品研发项目进度计划与控制[D];上海交通大学;2015年
4 付恩莉;戚机公司泰车研制项目进度计划与控制研究[D];大连理工大学;2015年
5 郭志卫;M公司转向节生产建设项目进度计划与控制[D];大连理工大学;2015年
6 陈磊;人力资源约束下某建筑工程项目进度计划研究[D];电子科技大学;2015年
7 张伟;轿车底盘耦合杆国产化项目进度计划管理[D];上海交通大学;2014年
8 苏奔;高层建筑灭火系统研发项目进度计划制定研究[D];北京工业大学;2015年
9 张亚妮;XX公司研发项目进度计划与控制改进研究[D];电子科技大学;2014年
10 邱柏榕;LA项目进度计划的研究[D];华南理工大学;2015年
,本文编号:2394484
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2394484.html