H银行MarginFX新增LP项目计划与控制研究
[Abstract]:H bank foreign exchange [V exhibition trading service is an investment product involving leverage and high risk degree. H bank foreign exchange trading platform has good system stability, which makes the trading of investors safer, simpler and faster. Based on the theory of IT project management, this paper analyzes the process of H bank foreign exchange [V exhibition platform] new liquidity provider project from start to end, focusing on the core and weak parts of the project, that is, the planning and control management of the project. Carry on the optimization design and the concrete research. Through the progress, cost and quality of the three aspects of planning and control to ensure the smooth launch of the system project. In the aspect of project plan formulation, this paper comprehensively introduces the major milestones of the project, the working relationship of WBS, the organizational structure and human resource plan, and estimates the project activity time through the combination of expert judgment method and plan evaluation technology. The activities are described in detail and the Gantt chart and network chart are drawn up, the main figures of each activity are identified, and the project cost plan and quality plan are worked out. In the aspect of project control, the progress of the project is controlled by the time limit optimization method, the cost progress of the project is evaluated by earned value analysis method, and the quality of the project is controlled by evaluation and test. This paper combines the advantages of modern IT project management and traditional project management, improves the overall level and development efficiency of H bank foreign exchange system development project, is beneficial to the smooth development of similar projects, and provides effective organization and arrangement. This study enriches the research in the field of IT project management and increases the experience of foreign exchange trading platform project using IT project management.
【学位授予单位】:华南理工大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:F831.2
【共引文献】
相关期刊论文 前6条
1 张静文;李若楠;;关键链项目调度方法研究评述综述与评论[J];控制与决策;2013年09期
2 张广帅;张煜东;吉根林;;蚁群算法求解TSP综述[J];南京师范大学学报(工程技术版);2014年04期
3 宫丽娜;;基于蚁群-关键链的资源受限项目调度[J];嘉兴学院学报;2014年03期
4 董军;冯天天;南晓红;;基于SD的资源约束型工程项目群进度管理研究[J];陕西电力;2014年09期
5 怀丽波;崔荣一;赵亚慧;;基于改进的蚁群算法的教室管理优化问题[J];延边大学学报(自然科学版);2014年04期
6 徐小峰;李想;刘家国;;项目关键链资源计划进度偏差预警控制模型[J];系统工程学报;2014年06期
相关博士学位论文 前3条
1 金敏力;基于关键链的项目优化调度问题研究[D];哈尔滨工业大学;2013年
2 付磊;基于关键链的复杂产品研发多项目调度问题研究[D];合肥工业大学;2013年
3 聂慧;建设工程施工项目人力资源调度的模型与方法研究[D];中国矿业大学(北京);2014年
相关硕士学位论文 前10条
1 袁乾龙;考虑不确定性的项目进度控制研究[D];华东理工大学;2013年
2 张斌;山西永济市35kV变电站增容改造项目进度管理的研究[D];华北电力大学;2013年
3 王达宇;陡河发电厂机组检修项目管理优化研究[D];华北电力大学;2013年
4 钟运彬;CF公司外贸制造项目进度管理研究[D];电子科技大学;2013年
5 肖寒;变电改造工程项目进度管理评价研究[D];华北电力大学;2013年
6 周棠;J电信公司外勤管家软件开发项目进度管理优化研究[D];南昌大学;2013年
7 汪若洋;项目进度管理方法及其应用研究[D];解放军信息工程大学;2013年
8 刘德金;基于关键链的钢结构制造企业多项目计划管理研究[D];重庆大学;2013年
9 庄蔚杰;基于关键链的多项目变更管理研究[D];上海交通大学;2013年
10 刘旭;基于关键链技术的大型粮食物流园区进度风险控制研究[D];河南工业大学;2013年
,本文编号:2485782
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2485782.html