棉花滩水电站建设监理项目管理
[Abstract]:Mianhuatan Hydropower Station is a large hydropower project with comprehensive benefits such as flood control and shipping, which is mainly based on power generation. East China Hydropower Project Consulting Company undertakes the supervision task of the whole project. The company has carried on the whole process, the omni-directional supervision work, has groped the experience in the organization setting, the personnel composition, the management system and so on, has obtained the result, through more than three years supervision practice, together with the construction owner and the contractor, causes the power station project to generate electricity in the first half of 2001, the project investment obtains the better control, the project quality is good.
【作者单位】: 华东水电工程咨询公司!浙江杭州310014
【分类号】:TV512
【相似文献】
相关期刊论文 前10条
1 纪实;闽浙赣水电基地[J];水力发电;1983年08期
2 ;国内水电消息[J];水力发电;1991年03期
3 ;前期工作动态[J];水力发电;1993年04期
4 费玉琴;;粉煤灰在棉花滩水电站坝体砼中的应用[J];粉煤灰综合利用;1993年01期
5 蓝伟龙 ,高平;陈元棣——踏遍青山人未老[J];中国水利;1994年08期
6 李有科 ,伟龙;明珠璀璨照闽西[J];中国水利;1994年09期
7 京信;前景广阔的工程机械市场[J];工程机械与维修;1994年01期
8 李启雄,倪玉平;棉花滩拱坝拱座稳定分析[J];湖南水利水电;1996年01期
9 郭金根,和再良;棉花滩水电站碾压混凝土大坝观测设计[J];大坝观测与土工测试;1997年03期
10 许剑华;汀江棉花滩水电站大坝过堰洪水的长期预报[J];水利科技;1999年S1期
相关重要报纸文章 前10条
1 林世雄 张强福 刘华荣;面对面沟通 心与心交流[N];福建日报;2000年
2 政协永定县委员会;挖掘土楼文化 开发旅游资源[N];人民政协报;2000年
3 通讯员 潘臻 本报记者 林光华;棉花滩水电站全部建成投产[N];中国电力报;2001年
4 本报记者 宋增威;龙岩矿务局七○八厂发展回眸[N];中国企业报;2001年
5 记者 宣宇才;福建经济综合竞争力增强[N];人民日报;2002年
6 邱武生;上杭采矿权出让走市场[N];中国矿业报;2003年
7 严镇威 李向龙;七朵奇葩的风采[N];中国电力报;2008年
8 钟德彪 陈建国;上杭璜溪网箱养殖富农家[N];闽西日报;2008年
9 刘永良;永定创新社会治安防控机制[N];闽西日报;2008年
10 发胜 东明 晓明 周胜;上杭建立保障失地农民利益长效机制[N];闽西日报;2009年
,本文编号:2524993