浅析项目建设中快速BT管理模式的探索
发布时间:2018-02-12 19:45
本文关键词: 快速BT 项目 管理 出处:《城市建设理论研究(电子版)》2016年30期 论文类型:期刊论文
【摘要】:快速BT是为适应工程项目快速建造、建施双方同步共管和有效控制造价的BT模式的一种变通,不仅能较好的解决建设单位资金紧张而不能实施项目的难题,在项目实施过程中同步参与建设,同时也解决了建设单位对工程施工过程质量、进度和造价控制困难的问题。该模式特别适合于大型项目的快速施工管理,能够安全、优质、低耗、高效,以最短时间,最低成本完成项目建设,确保合同全面履约,同时有效的降低建施双方的风险,值得推广应用。
[Abstract]:In order to adapt to the rapid construction of engineering projects, the BT mode of simultaneous management and effective cost control between the two sides can not only solve the problem that the construction unit is short of funds but can not carry out the project. It also solves the problem that the construction unit is difficult to control the quality, progress and cost of the construction process. This model is especially suitable for the rapid construction management of large projects, and can be safe and high quality. Low consumption, high efficiency, the shortest time, the lowest cost to complete the project construction, to ensure the full performance of the contract, while effectively reducing the risk of construction and implementation of both sides, worthy of promotion and application.
【作者单位】: 中建七局安装工程有限公司;
【分类号】:TU71
,
本文编号:1506411
本文链接:https://www.wllwen.com/jianzhugongchenglunwen/1506411.html