深基坑“支—围护单一墙”顺作法施工过程中力学响应的数值分析
[Abstract]:With the development of our country's economy and the advancement of urbanization, the super high-rise building and underground engineering are increasing day by day, and the deep foundation pit engineering is also more and more, and the scarcity of land resources forces us to make more reasonable use of underground space. This has to put forward a higher request to the foundation pit engineering of the building. "two walls in one" underground continuous wall is widely used because of its advantages in controlling deformation, shortening construction period and sustainable development. Based on the example of a deep foundation pit project with "two walls in one" underground continuous wall combined with internal bracing structure, the method of elastic resistance method and numerical simulation is used to carry out the research in this paper. In this paper, the finite element model of the construction process is established by using the ABAQUS software, and the soil mass, the enclosure structure and the surrounding environment are analyzed by two-dimensional numerical method. The main work of this paper is as follows: (1) the paper analyzes and calculates the excavation process by using the incremental method in the software of Lizheng Deep Foundation Pit, and obtains the internal force and deformation of the underground continuous wall during the excavation. The settlement of soil around the foundation pit is predicted. (2) the horizontal displacement, the horizontal displacement of the soil, the uplift of the bottom and the settlement of the surface of the pit are systematically analyzed. The horizontal displacement of the diaphragm wall is compared with the actual monitoring results, which shows that the ABAQUS two-dimensional numerical simulation can be used to predict the parameters when the parameters are suitable. (3) the main related parameters are analyzed by using the ABAQUS finite element software. The influence factors such as the thickness of underground diaphragm wall, the stiffness of internal support and the parameters of soil (internal friction angle, cohesive force) are studied, and the influence of these factors on the lateral displacement of underground continuous wall with "two walls in one" is analyzed. The analysis shows that the wall deformation can be controlled by increasing the thickness of diaphragm wall, but when it is increased to a certain range, it has little effect on the wall deformation. The horizontal displacement of the diaphragm wall decreases with the increase of the stiffness of the inner bracing, and decreases gradually. When the stiffness increases beyond a certain range, the influence on the wall deformation is not obvious. By changing the cohesive force and internal friction angle of soil in the process of modeling, it is found that increasing the internal friction angle and cohesion force can control the deformation of foundation pit well, and the internal friction angle has more influence on the wall deformation.
【学位授予单位】:山东建筑大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TU753
【相似文献】
相关期刊论文 前10条
1 麻冬敏;王萌;;深基坑变形的影响因素[J];科技信息;2012年05期
2 吴银霞;;周边有建筑存在环境下深基坑施工的影响与施工技术[J];科技创新与应用;2012年20期
3 王君;;建筑工程深基坑施工中存在的问题及解决措施[J];中华民居(下旬刊);2013年12期
4 顾春辉;;浅谈深基坑变形控制研究进展[J];城市建筑;2013年22期
5 李云安,葛修润,张鸿昌;深基坑工程变形控制与有限元数值模拟分析[J];地质与勘探;2001年05期
6 李云安,张鸿昌,糜崇蓉;深基坑工程变形控制及其影响因素的有限元分析[J];水文地质工程地质;2001年04期
7 郑必勇,李真民;深基坑工程环境质量问题浅析[J];江苏建筑;2002年03期
8 朱瑞钧,王杰光,齐干;灌注桩支护条件下深基坑变形分析[J];广西工学院学报;2003年04期
9 姚黔贵;城市深基坑变形监测的实施[J];贵州工业大学学报(自然科学版);2005年02期
10 范建;师旭超;;深基坑变形预测方法综述[J];西部探矿工程;2006年04期
相关会议论文 前10条
1 师旭超;巴松涛;;基于支持向量机方法的深基坑变形预测[A];科技、工程与经济社会协调发展——河南省第四届青年学术年会论文集(上册)[C];2004年
2 叶俊能;刘干斌;;宁波地区深基坑工程施工预警指标及风险评估研究[A];运营安全与节能环保的隧道及地下空间建设第2届学术研讨会交流报告[C];2011年
3 张康;崔江余;;石家庄某深基坑变形数值分析[A];第十届建构筑物改造和病害处理学术研讨会、第五届工程质量学术会议论文集[C];2014年
4 楼楠;胡玉祥;;基于非固定站模式的大型深基坑变形监测[A];第二十一届海洋测绘综合性学术研讨会论文集[C];2009年
5 王建华;徐中华;陈锦剑;王卫东;;上海软土地区深基坑连续墙的变形特性浅析[A];上海软土地区深基坑技术新进展研讨会论文集[C];2005年
6 贾坚;;控制深基坑变形的坑内加固技术研究[A];2004年度上海市土力学与岩土工程学术年会论文集[C];2004年
7 王建华;徐中华;陈锦剑;王卫东;;上海软土地区深基坑连续墙的变形特性浅析[A];上海软土地深基坑技术新进展研讨会论文集[C];2005年
8 任旺瑜;王建秀;;基于混沌理论和模糊控制理论的深基坑变形预测研究[A];上海防灾救灾研究所20周年庆典会议研究短文集[C];2009年
9 张冬至;;浅谈深基坑变形监测工作的质量控制[A];全国测绘科技信息网中南分网第二十一次学术信息交流会论文集[C];2007年
10 刘艳滨;;上海外滩通道长大深基坑工程对紧邻风貌建筑群的保护技术[A];第九届海峡两岸隧道与地下工程学术及技术研讨会论文集[C];2010年
相关博士学位论文 前10条
1 徐杨青;深基坑工程优化设计理论与动态变形控制研究[D];武汉理工大学;2002年
2 卢一凡;武汉地区深基坑工程支护结构安全评价研究[D];华中科技大学;2011年
3 沈细中;深基坑工程基本过程数值模拟及实时优化研究[D];武汉大学;2004年
4 冯勇;寒冷地区深基坑土钉支护的环境事故及其防治技术研究[D];新疆农业大学;2009年
5 许婷华;青岛沿海地区深基坑支护施工方案优化与质量控制研究[D];中国海洋大学;2006年
6 单宝学;凯莱大酒店深基坑工程设计与施工关键技术研究[D];中国矿业大学(北京);2015年
7 李志高;地下综合体深基坑施工环境影响及保护研究[D];同济大学;2006年
8 徐中华;上海地区支护结构与主体地下结构相结合的深基坑变形性状研究[D];上海交通大学;2007年
9 李连祥;冲积地层的开挖与支护设计及工程决策研究[D];山东科技大学;2007年
10 丁敏;深基坑支护细部结构优化及应用研究[D];重庆大学;2012年
相关硕士学位论文 前10条
1 蒲应举;深基坑开挖过程的数值模拟及稳定分析[D];昆明理工大学;2015年
2 孙学聪;深基坑变形监测及变形预测研究[D];长安大学;2015年
3 刘安宁;黄土地区深基坑坑角效应研究[D];长安大学;2015年
4 朱凤君;锚拉排桩技术在城市深基坑中的适用性研究[D];长安大学;2015年
5 汪磊;紧邻高速公路偏压深基坑稳定性分析[D];安徽建筑大学;2015年
6 李晓婉;软土填海区域深基坑围护结构变形预警值研究[D];大连理工大学;2015年
7 钱希坤;软弱地层不同支护刚度深基坑数值仿真分析与变形研究[D];大连交通大学;2015年
8 王磊;逆作法深基坑监测数据处理与变形预测研究[D];长沙理工大学;2014年
9 卢福钊;广州番禺某深基坑桩锚支护数值模拟研究与监测数据分析[D];暨南大学;2015年
10 胡聂雷;深基坑支护及施工风险评估研究[D];东华理工大学;2015年
,本文编号:2266171
本文链接:https://www.wllwen.com/jianzhugongchenglunwen/2266171.html