【摘要】:工程桩基,由于各种原因,完成的桩基和设计院设计的桩基位置会存在偏差,但我们必须知道这偏差有多大,是否满足桩基设计偏差要求和相关规范的要求,因此,我们必须要快速的拿出桩基偏差数据。本文通过数字化成图技术,使用全站仪第一时间采集完成桩位的坐标采集,通过图形对比,快速得出桩位偏差数据。
[Abstract]:Due to various reasons, there will be a deviation between the completed pile foundation and the pile foundation designed by the design institute, but we must know how large this deviation is and whether it meets the requirements of pile foundation design deviation and related codes. We must take out the deviation data of pile foundation quickly. In this paper, through the digital mapping technology, the total station is used to collect the coordinates of the pile position at the first time, and the pile position deviation data is obtained quickly by graphic comparison.
【作者单位】: 中建三局集团有限公司西北分公司;
【分类号】:TU753.3
本文编号:2485083
[Abstract]:Due to various reasons, there will be a deviation between the completed pile foundation and the pile foundation designed by the design institute, but we must know how large this deviation is and whether it meets the requirements of pile foundation design deviation and related codes. We must take out the deviation data of pile foundation quickly. In this paper, through the digital mapping technology, the total station is used to collect the coordinates of the pile position at the first time, and the pile position deviation data is obtained quickly by graphic comparison.
【作者单位】: 中建三局集团有限公司西北分公司;
【分类号】:TU753.3
【相似文献】
相关期刊论文 前10条
1 刘学军,江胜文,简卫平;数字测图、数字制图及勘测设计一体化[J];江西水利科技;1999年03期
2 郭军海;邵汉平;;武汉某桩基工程桩位偏差超限原因分析[J];西部探矿工程;2009年03期
3 郁志芳;;桩基础施工桩位偏差测量与控制实践[J];西部探矿工程;2013年03期
4 黄巍;;桩位偏差浅析[J];橡塑技术与装备;2013年08期
5 郭军海;曾纪文;兰方鑫;;无循环旋挖工艺桩位偏差的控制[J];西部探矿工程;2009年03期
6 王刚,王岚;桩位偏差后桩的受力分析[J];内蒙古工业大学学报(自然科学版);2002年02期
7 李卫;钻孔灌注桩桩位偏差分析[J];长春地质学院学报;1996年02期
8 蔡长赓;施工偏差对二桩承台的影响[J];广州建筑;1996年01期
9 冯晓庆;;钻孔灌注桩桩位偏差的原因分析及控制措施[J];山西建筑;2013年09期
10 张春来;郭君科;穆怀刚;;灌注桩混凝土基础的桩位偏差控制[J];黑龙江水利科技;2006年05期
,本文编号:2485083
本文链接:https://www.wllwen.com/jianzhugongchenglunwen/2485083.html