  本文选题:电网规划 + “十三五”发展规划 ; 参考:《华北电力大学》2016年硕士论文


【摘要】:随着经济社会的不断发展和人民生活水平的不断提高,对电网的要求也不断提高,而包头电网逐渐突显出其安全、稳定以及输送能力等问题。电网规划如何适应当前国民经济和社会发展的需要,建设安全、可靠、经济和稳定运行的电网已经成为电网的中心问题。本文在《蒙西电网主网架“十三五”发展规划研究》的基础上,研究并编制《包头地区“十三五”电网发展规划》。主要完成了以下工作:(1)充分收集“十三五”规划需求资料,包括“十一五”、“十二五”期间需求的各方面数据,并针对2015年包头地区网架进行电气计算,发现包头地区存在的问题。(2)根据“十一五”、“十二五”期间的相关历史数据及未来发展预期目标,综合采用弹性系数法、产值单耗法、回归分析法、时间序列法等分别对包头市国民生产总值、全社会用电量需求、供电负荷进行预测。(3)详细分析新能源机组100%、70%、50%等情况下的包头电网整体电力平衡和220kV侧电力平衡和分区电力平衡等,提出了包头电网的电源建设与网架建设方案,并详细制定变电站规划方案,对包含500kV、220kV、110kV的主网架进行规划,对电网结构进行论证,并对“十三五”规划进行投资估算。科学、超前的规划电网发展对今后电网建设的经济规范运作、统筹规划电网、电源建设有重要指导意义。
[Abstract]:With the continuous development of the economic society and the continuous improvement of the people's living standards, the demand for the power grid is also increasing, and the Baotou power grid has gradually highlighted its safety, stability and transport capacity. How to adapt to the needs of the current national economic and social development, the power grid has been built in a safe, reliable, economical and stable operation On the basis of the "13th Five-Year" development planning study of the main grid frame of the Mengxi power grid, this paper has studied and compiled the "13th Five-Year" power grid development plan of the Baotou area in 13th Five-Year. The following work has been completed mainly: (1) fully collect the "13th Five-Year" planning requirements, including the "11th Five-Year" and "12th Five-Year" requirements. According to the data of various aspects of Baotou area network frame in 2015, the existing problems in the Baotou area are found. (2) according to the historical data of "11th Five-Year", "12th Five-Year" and the future development target, elastic coefficient method, output value single consumption method, regression analysis method, time series method, etc. are used in Baotou City, respectively. Gross national product (GNP), whole social electricity demand, power supply load forecast. (3) detailed analysis of the overall power balance and 220kV side power balance and the zoning power balance of the Baotou power grid under the conditions of 100%, 70%, 50% of the new energy units, and put forward the power construction and grid construction scheme of the Baotou power grid, and make a detailed plan for the substation. The main network framework including 500kV, 220kV and 110kV is planned, the structure of the power grid is demonstrated, and the investment estimation of the "13th Five-Year" plan is carried out. The scientific development of the advanced planning grid will be of great significance to the economic standard operation of the power grid construction in the future, the overall planning of the power grid and the power supply construction.

【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2016
【分类号】:F426.61

【参考文献】

相关期刊论文 前10条

1 彭波;陈旭;徐乾耀;张宁;康重庆;;面向新能源消纳的电网规划方法初探[J];电网技术;2013年12期

2 王深哲;高山;李海峰;张龙;;含风电接入的电网规划方案电能质量评估[J];电工技术学报;2013年08期

3 孙泽宇;姬晓辉;;改进启发式蚁群算法求解电网规划优化问题[J];计算机仿真;2013年01期

4 周鲲鹏;方仍存;颜炯;康重庆;林海英;刘秀坤;;电网规划智能辅助决策系统的设计与实现[J];电力系统自动化;2013年03期

5 张新松;袁越;陈哲;惠东;杨凯;;考虑电能质量约束的含风电场电网规划[J];电网技术;2012年06期

6 田廓;邱柳青;曾鸣;;基于动态碳排放价格的电网规划模型[J];中国电机工程学报;2012年04期

7 周天睿;王旭;张谦;张宁;黄俊辉;王之伟;康重庆;;大规模风电对江苏电网规划影响的实证分析[J];中国电力;2010年02期

8 梁周;傅渝洁;杨鹏举;张怡;曾鸣;田廓;;考虑需求侧管理的电力规划模型与实证研究[J];华东电力;2009年07期

9 刘达;牛东晓;张云云;;中国电力市场改革中的电力规划问题研究[J];华东电力;2008年08期

10 黄训诚;庄奕琪;耿阿囡;;基于改进蚁群算法的配电网优化规划[J];西安交通大学学报;2007年06期



本文编号:1868829

资料下载
论文发表

本文链接:https://www.wllwen.com/jingjilunwen/gongyejingjilunwen/1868829.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户5e7aa***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com