塔城边境城镇发展项目管理比较研究

发布时间:2018-01-11 20:17

  本文关键词:塔城边境城镇发展项目管理比较研究 出处:《新疆农业大学》2014年硕士论文 论文类型:学位论文


  更多相关文章: 项目 项目管理 阶段对比


【摘要】:从1987年我国开始使用亚行贷款,目前已是亚行贷款累计第二大借款国。在多年利用亚行贷款的实践中,逐步形成了比较完整的计划和管理体系。从2006年起,新疆利用亚行贷款项目已实施六期。新疆塔城边境城镇发展项目作为新疆亚行项目第六期,项目总投资总投资17.06亿元,利用亚行贷款1.5亿美元,地方配套资金8.06亿元人民币,建设地点为塔城市、额敏县、托里县、裕民县,建设内容为道路工程、给水工程、排水工程、集中供热工程、河道综合治理及垃圾收集等工程组成。本文通过对亚行塔城边境城镇发展项目研究,对比亚行项目与国内同类项目在规划阶段、前期准备阶段、实施阶段、项目后评价阶段分阶段比较和整体比较,发现亚行项目虽然在前期手续审批比国内同类项目繁琐,导致前期准备周期较长,但亚行项目在实地调研、公众参与、项目监管、项目后评价等方面具有较强优势,结合国内项目管理程序的逐步规范及项目管理能力的提升,提出加强国内项目的规划指导作用、加强项目实施期间监管、建立健全项目后评价体系等建议。
[Abstract]:The use of ADB loan from 1987 began in China, has accumulated second ADB loan borrowers. In practice, the use of ADB loans in years, and gradually formed a relatively complete system of planning and management. From 2006 onwards, the Xinjiang based ADB loan project has been implemented in six. Project development in the border town of Xinjiang Tacheng Xinjiang as the ADB project sixth, the total investment of the project total investment of 1 billion 706 million yuan, the use of ADB loans of $150 million, local matching funds of 806 million yuan, the construction site of the tower city, E Min County, Tori County, Yumin County, construction content for road engineering, water supply and drainage engineering, engineering, central heating project, river comprehensive management and garbage collection project based on the research of the project. The development of the border town of ADB in Tacheng, compared with the domestic similar projects in the ADB project planning stage, preparation stage, implementation stage and project The evaluation stages and overall comparison, found that although the approval formalities in the early ADB project than similar domestic projects lead to cumbersome, preparatory period is longer, but the ADB project in the field of research, public participation, project supervision, has strong advantages such as post project evaluation, combined with the project management process of domestic standardization and project management. To enhance the role of domestic projects, put forward to strengthen planning guidance, strengthen supervision during the project implementation, the establishment of evaluation system and so on to improve project.

【学位授予单位】:新疆农业大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:F283;F831.2

【相似文献】

相关期刊论文 前10条

1 ;国家科技攻关计划项目贷款贴息管理试行办法[J];科技经济市场;2001年06期

2 中国农业银行四川省达州市分行课题组;对分散和化解基础设施项目贷款风险的对策研究[J];中国农业银行武汉培训学院学报;2003年04期

3 史新和;南京农业发展的金融支持—农业项目贷款[J];南京农专学报;2003年02期

4 农业银行达州市分行课题组;对分散和化解基础设施项目贷款风险的对策研究[J];西南金融;2003年05期

5 袁险峰;浅析投资体制改革对银行项目贷款的影响[J];特区经济;2004年09期

6 许朝晖,马军;银行项目贷款后评价初探[J];中国城市金融;2005年05期

7 曹阳;项目贷款风险的法律控制[J];商业研究;2005年12期

8 吴s,

本文编号:1411056


资料下载
论文发表

本文链接:https://www.wllwen.com/jingjilunwen/guojijinrong/1411056.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户e1c14***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com