基于综合评价法的港口工程投标决策定量研究
发布时间:2018-07-31 10:17
【摘要】:本文以复杂环境条件下港口工程投标决策为研究对象,依据定量管理决策理论,应用现代综合评价方法进行了投标决策定量研究。 文中首先分析、总结了港口工程施工行业市场竞争的现状和投标管理面临的复杂环境背景,指出投标决策定性分析主观性、盲目性的局限性以及投标决策科学化、定量化的重要意义;然后阐述了投标决策及定量管理决策理论及研究现状,为本文的研究提供理论基础;之后结合公司投标管理的组织模式以及项目实施中存在的问题,分析了投标决策工作的缺陷和不足,并在此基础上,依据投标决策及定量管理决策的基础理论,应用现代综合评价方法,构建了港口工程投标决策定量模型,并介绍了应用该模型进行投标项目评价的步骤;之后介绍了某港口工程的投标工作及项目实施过程中存在的问题,反观和分析了投标决策中的主观性和盲目性的缺陷和不足,并应用定量模型对其进行了评价;最后对本研究作出结论,并指出本研究存在的问题及下一步的研究展望。本文的研究旨在指出公司在投标决策环节亟待解决的主观性、盲目性问题,希望通过定量化模型辅助决策的这种方式方法,为复杂环境条件下公司投标决策科学化、定量化的管理改革提供参考。
[Abstract]:Based on the decision theory of quantitative management and modern comprehensive evaluation method, this paper takes the bidding decision of port engineering under complex environment as the research object. Firstly, the paper analyzes and summarizes the present situation of market competition in port engineering construction industry and the complex environment background of bidding management, and points out that the qualitative analysis of bidding decision is subjective, the limitation of blindness and the scientization of bidding decision. The significance of quantification, the theory and research status of bidding decision and quantitative management decision are expounded, which provides the theoretical basis for the research of this paper. Then, combining with the organization mode of the bidding management of the company and the problems in the implementation of the project, Based on the analysis of the defects and shortcomings of bidding decision making, and based on the basic theory of bid decision and quantitative management decision, a quantitative model of bidding decision for port engineering is constructed by applying modern comprehensive evaluation method. The paper also introduces the steps of applying this model to the evaluation of bidding project, then introduces the problems existing in the bidding work of a port project and the implementation of the project, and analyzes the defects and shortcomings of subjectivity and blindness in bidding decision making. The quantitative model is used to evaluate it. Finally, the conclusion of this study is drawn, and the problems in this study and the future research prospects are pointed out. The purpose of this paper is to point out the subjective and blind problems that need to be solved in bidding decision making. It is hoped that the quantitative model can be used to assist the decision-making in order to make the bidding decision more scientific under the complex environment. The quantitative management reform provides the reference.
【学位授予单位】:天津大学
【学位级别】:硕士
【学位授予年份】:2012
【分类号】:F552;U655.2
[Abstract]:Based on the decision theory of quantitative management and modern comprehensive evaluation method, this paper takes the bidding decision of port engineering under complex environment as the research object. Firstly, the paper analyzes and summarizes the present situation of market competition in port engineering construction industry and the complex environment background of bidding management, and points out that the qualitative analysis of bidding decision is subjective, the limitation of blindness and the scientization of bidding decision. The significance of quantification, the theory and research status of bidding decision and quantitative management decision are expounded, which provides the theoretical basis for the research of this paper. Then, combining with the organization mode of the bidding management of the company and the problems in the implementation of the project, Based on the analysis of the defects and shortcomings of bidding decision making, and based on the basic theory of bid decision and quantitative management decision, a quantitative model of bidding decision for port engineering is constructed by applying modern comprehensive evaluation method. The paper also introduces the steps of applying this model to the evaluation of bidding project, then introduces the problems existing in the bidding work of a port project and the implementation of the project, and analyzes the defects and shortcomings of subjectivity and blindness in bidding decision making. The quantitative model is used to evaluate it. Finally, the conclusion of this study is drawn, and the problems in this study and the future research prospects are pointed out. The purpose of this paper is to point out the subjective and blind problems that need to be solved in bidding decision making. It is hoped that the quantitative model can be used to assist the decision-making in order to make the bidding decision more scientific under the complex environment. The quantitative management reform provides the reference.
【学位授予单位】:天津大学
【学位级别】:硕士
【学位授予年份】:2012
【分类号】:F552;U655.2
【参考文献】
相关期刊论文 前10条
1 曹琳剑;王雪青;刘炳胜;杨玉;;基于灰色局势法改进的建筑工程投标决策方法研究[J];北京理工大学学报(社会科学版);2009年04期
2 ;关于当前建设项目招标投标情况和存在的问题[J];中国工程咨询;2002年03期
3 刘尔烈,钱斌;多因素模糊评价的投标报价决策方法[J];中国港湾建设;2003年03期
4 周宇辉;工程项目投标可行性分析与决策模型[J];中国港湾建设;2004年03期
5 郝丽萍,谭庆美,戈勇;基于博弈模型和模糊预测的投标报价策略研究[J];管理工程学报;2002年03期
6 郝丽萍,郑远挺,谭庆美;建设工程投标报价的博弈模型研究[J];哈尔滨建筑大学学报;2002年02期
7 呼大永;冯玉强;付铭;曲云波;;在线逆向拍卖供应商投标决策支持模型[J];哈尔滨工业大学学报;2011年09期
8 张宪;王雪青;;招标控制价模式下工程项目投标报价博弈模型研究[J];建筑经济;2010年12期
9 祝世京,陈s,
本文编号:2155279
本文链接:https://www.wllwen.com/jingjilunwen/jtysjj/2155279.html