JH高速铁路公司建设项目融资问题研究
[Abstract]:As an important part of national public infrastructure, high-speed railway has become a symbol of a country's economic strength. The traditional railway system has become a bottleneck restricting China's economy. In view of this situation, in the 12th Five-Year Plan, it was clearly stated that by the end of 2015, China's high-speed railway will reach 40,000 kilometers. It accounts for 1/3 of our country's entire railway system. The construction period of high-speed railway project is relatively long, the investment is huge, it is not enough to rely solely on the national financial expenditure, so exploring the reasonable financing way has become the urgent problem of the high-speed railway construction in our country. Based on the above background, we hope that the research on the financing scheme of JH high-speed railway can provide reference for the financing of high-speed railway construction in China. This paper first studies the process of high-speed railway financing in foreign developed countries, and summarizes the common ground in their development process, hoping to provide help for the current high-speed railway financing in China. Then through the analysis of the JH high-speed railway construction background and financing structure, the paper puts forward three problems encountered in the financing process of Beijing-Shanghai high-speed railway: the non-public capital subject is treated with discrimination. Financing management backward and railway enterprises do not have market-based financing qualifications. Aiming at the above three problems, JH designs solutions from two channels: equity financing and debt financing. Finally, we evaluate the financial and social effects of the financing scheme of JH Company, and propose three measures to ensure the smooth financing of China's high-speed railway: (1) raising construction funds through multiple channels. Under the guidance of central financial funds; (2) opening up the ownership and operation of railway to local and social capital step by step; (3) vigorously promoting high-speed rail PPP financing mode this paper hopes to further study the case of high-speed railway financing of JH Company. It provides some theoretical and practical reference for the future development of railway construction financing in China.
【学位授予单位】:湘潭大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:F532;F283
【相似文献】
相关期刊论文 前10条
1 高荣武;;JH—200F暖空调检修与电路图测绘[J];家电检修技术;2002年08期
2 闫永红 ,原艳红;嘉陵JH—70摩托车电源电路的组成及检修[J];摩托车;2000年10期
3 ;JH型标准信封检测仪及XBH型旋转式粘度计[J];中国新技术新产品精选;1995年01期
4 王云;;JH—15内河钢质监航船通过省级鉴定[J];技术经济信息;1989年09期
5 李强;王常洪;曾志芳;朱志敏;陈术勋;马瑞;;JH型增效减水剂的试验和应用[J];混凝土;2011年10期
6 赵继军;;JH轮主机气动控制系统一起动故障分析处理[J];航海技术;2012年02期
7 陈兴富;夏明采;;6XJH柑桔果酱加工去核机[J];机械;1985年02期
8 赵忠初;;JH挂车双级断气制动系[J];汽车技术;1989年08期
9 张传军,陈关喜;TVM300设备JH抽匣检修测试台[J];铁道通信信号;1998年11期
10 林阳春;;JH 轮主机增压器故障分析与思考[J];船舶节能;2001年01期
相关重要报纸文章 前1条
1 季广祥;888—JH用于焦炉气脱硫[N];中国化工报;2003年
相关硕士学位论文 前10条
1 吴春华;呼和浩特市JH置业有限公司发展战略研究[D];内蒙古大学;2015年
2 王樱傧;JH高速铁路公司建设项目融资问题研究[D];湘潭大学;2015年
3 戴川;JH机场服务的现状、优化与实施研究[D];电子科技大学;2013年
4 符鹏;JH公司客户关系管理研究[D];天津大学;2012年
5 王君玲;JH公司内部控制体系的优化及运行研究[D];西安科技大学;2009年
6 夏寒光;JH汽车公司股票投资价值评估的研究[D];安徽财经大学;2014年
7 张颀;JH公司服务运作模式研究[D];四川大学;2004年
8 韩晓慧;JH公司的发展战略研究[D];电子科技大学;2003年
9 戴路明;西安JH保障性住房项目市场化开发模式研究[D];中南大学;2012年
10 王亭苏;江西JH盐化公司实现可持续发展的战略研究[D];南华大学;2013年
,本文编号:2281804
本文链接:https://www.wllwen.com/jingjilunwen/jtysjj/2281804.html