提升上海轨道交通1号线列车运行正点率的思考与对策
发布时间:2019-05-15 09:02
【摘要】:通过对上海轨道交通1号线2012年正点率的统计分析,将制约正点率的主要因素归纳为客观、车辆设备、通号设备等原因。分别拟定了优化客运组织、优化乘务作业环节及加强应急处置能力等对策,并在2013年组织实施。
[Abstract]:Based on the statistical analysis of the punctuality rate of Shanghai Rail Transit Line 1 in 2012, the main factors restricting the punctuality rate are summarized as objective, vehicle equipment, on-line equipment and so on. The countermeasures of optimizing passenger transport organization, optimizing crew operation and strengthening emergency disposal capacity were drawn up and implemented in 2013.
【作者单位】: 上海地铁第一运营有限公司;
【分类号】:F572.88
,
本文编号:2477386
[Abstract]:Based on the statistical analysis of the punctuality rate of Shanghai Rail Transit Line 1 in 2012, the main factors restricting the punctuality rate are summarized as objective, vehicle equipment, on-line equipment and so on. The countermeasures of optimizing passenger transport organization, optimizing crew operation and strengthening emergency disposal capacity were drawn up and implemented in 2013.
【作者单位】: 上海地铁第一运营有限公司;
【分类号】:F572.88
,
本文编号:2477386
本文链接:https://www.wllwen.com/jingjilunwen/jtysjj/2477386.html