沈阳国家中心城市建设中政府行为研究
发布时间:2019-01-06 13:51
【摘要】:沈阳是我国重要的重工业基地,为我国现代化建设做出了不可磨灭的贡献。自改革开放以来,尤其是近几年,沈阳经济总量不断增加,经济实力明显增强。沈阳市第十二个五年规划提出将沈阳建设成为国家中心城市,沈阳市政府作为国家中心城市建设的主要推动者,在国家中心城市的建设中发挥着重要作用,引领着沈阳市整体经济发展和社会建设。然而,沈阳市政府在国家中心城市的建设中还存在着种种问题,迫切需要进一步优化政府在国家中心城市建设中的一些行为,特别是进行中心城市建设的规划以及政策充分供给等,以实现高效建设国家中心城市的目标。本文首先界定了国家中心城市、国家中心城市建设中政府行为的内涵及特点,重点分析了沈阳国家中心城市建设中政府行为的现状、存在的问题以及问题的原因。沈阳市政府在建设国家中心城市的过程中还存在几乎包办所有事务、工作效率偏低、行政监督手段有待加强等问题,而传统政府的社会管理思维、追求政绩的官僚模式、社会组织发展相对滞后等则是造成以上问题的主要原因。鉴于此,提出树立正确的城市经营理念和价值观、加快转变政府职能,突出政府行为效率、规范行政监督运行手段,鼓励社会成员共同参与等改进沈阳国家中心城市建设中政府行为的建议。
[Abstract]:Shenyang is an important heavy industry base in China, which has made an indelible contribution to the modernization of our country. Since the reform and opening up, especially in recent years, Shenyang's total economic volume has been increasing, and its economic strength has obviously increased. The twelfth five-year plan of Shenyang proposed that Shenyang should be built into a national central city, and the Shenyang municipal government, as the main promoter of the construction of the national central city, played an important role in the construction of the national central city. Leading the overall economic development and social construction in Shenyang. However, there are still many problems in the construction of the national central city in Shenyang municipal government. It is urgent to further optimize some behaviors of the government in the construction of the national central city. In order to realize the goal of constructing the national central city efficiently, the planning and policy supply of the central city construction are carried out. This paper first defines the connotation and characteristics of the government behavior in the national central city and the construction of the national central city, and analyzes emphatically the present situation, the existing problems and the reasons of the problems in the construction of the national central city in Shenyang. In the process of building the central city of Shenyang, there are still some problems, such as almost all affairs are arranged, the work efficiency is on the low side, and the administrative supervision means need to be strengthened, while the traditional government's social management thinking and the bureaucratic mode of pursuing the achievements of the government, and so on. The relative lag in the development of social organizations is the main cause of the above problems. In view of this, it is proposed to establish correct urban management concepts and values, speed up the transformation of government functions, highlight the efficiency of government behavior, and standardize the means of operation of administrative supervision. To encourage the participation of members of the community and other suggestions for improving government behavior in the construction of Shenyang National Center City.
【学位授予单位】:东北大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:D630
[Abstract]:Shenyang is an important heavy industry base in China, which has made an indelible contribution to the modernization of our country. Since the reform and opening up, especially in recent years, Shenyang's total economic volume has been increasing, and its economic strength has obviously increased. The twelfth five-year plan of Shenyang proposed that Shenyang should be built into a national central city, and the Shenyang municipal government, as the main promoter of the construction of the national central city, played an important role in the construction of the national central city. Leading the overall economic development and social construction in Shenyang. However, there are still many problems in the construction of the national central city in Shenyang municipal government. It is urgent to further optimize some behaviors of the government in the construction of the national central city. In order to realize the goal of constructing the national central city efficiently, the planning and policy supply of the central city construction are carried out. This paper first defines the connotation and characteristics of the government behavior in the national central city and the construction of the national central city, and analyzes emphatically the present situation, the existing problems and the reasons of the problems in the construction of the national central city in Shenyang. In the process of building the central city of Shenyang, there are still some problems, such as almost all affairs are arranged, the work efficiency is on the low side, and the administrative supervision means need to be strengthened, while the traditional government's social management thinking and the bureaucratic mode of pursuing the achievements of the government, and so on. The relative lag in the development of social organizations is the main cause of the above problems. In view of this, it is proposed to establish correct urban management concepts and values, speed up the transformation of government functions, highlight the efficiency of government behavior, and standardize the means of operation of administrative supervision. To encourage the participation of members of the community and other suggestions for improving government behavior in the construction of Shenyang National Center City.
【学位授予单位】:东北大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:D630
【相似文献】
相关期刊论文 前10条
1 宫希魁,戴学章,曲真儒;论城市建设中的几个关系[J];中国党政干部论坛;2001年09期
2 ;美国城市建设与发展的经验及启示[J];探求;2001年02期
3 田序华;城市建设中的特色美[J];理论学习;2001年10期
4 魏国强;坚持开放原则 加快城市建设[J];中国党政干部论坛;2002年01期
5 张良;警惕城市建设"国企病"[J];南风窗;2003年02期
6 沙犁;;城市建设急不得[J];廉政w,
本文编号:2402874
本文链接:https://www.wllwen.com/jingjilunwen/quyujingjilunwen/2402874.html