塔式起重机基础利用工程桩改善地基承载力施工技术

发布时间:2018-01-30 01:33

  本文关键词: 桩基 地基承载力 塔式起重机基础 出处:《施工技术》2017年S1期  论文类型:期刊论文


【摘要】:塔式起重机基础对塔式起重机的正常运转和安全起着至关重要的作用,因此塔式起重机基础的选择和施工是施工过程中特别重要的一项内容。针对鲁能三亚湾美丽五区二标项目塔式起重机基础布置在地下室底板范围内且天然地基承载力不满足要求时,塔式起重机基础的设计与施工方法,包括:塔式起重机基础的选型、桩基的施工、塔式起重机基础防水的施工、塔式起重机穿地下室的处理方法。
[Abstract]:Tower crane foundation plays a vital role in the normal operation and safety of tower crane. Therefore, the selection and construction of tower crane foundation is one of the most important contents in the construction process. The tower crane foundation is arranged within the basement floor area and natural foundation support for the second standard project of the beautiful five area of Luneng Sanya bay. When the load does not meet the requirements. The design and construction methods of tower crane foundation include the selection of tower crane foundation, the construction of pile foundation, the waterproof construction of tower crane foundation, and the treatment of tower crane through basement.
【作者单位】: 中国建筑第八工程局有限公司海南分公司;
【分类号】:TH213.3
【正文快照】: 1工程概况鲁能三亚湾美丽五区二标工程位于三亚市海坡旅游度假区,南临三亚湾椰梦长廊,北临凤凰国际机场。项目总建筑面积19.2万m2,共包括13栋18层塔楼,地下室1层,建筑高度55.35m。本工程共投入8台塔式起重机,塔式起重机基础均布置在地下室底板范围内,1、2、8号塔式起重机型号

本文编号:1474923

资料下载
论文发表

本文链接:https://www.wllwen.com/jixiegongchenglunwen/1474923.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户b4b98***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com