长平煤矿回风立井施工及综合防治水技术
发布时间:2019-05-15 22:10
【摘要】:为确保长平煤矿回风立井的施工安全,通过理论分析确定井筒在风化基岩和基岩中的施工、支护方案,根据井筒穿过的含水层情况,决定采用工作面超前预注浆和壁后注浆的综合防治水技术。通过分析含水层的位置确定注浆段高,结合浆液的有效扩散半径估算注浆量,超前预注浆量为1 758 m~3,壁后注浆量为1 585 m~3。
[Abstract]:In order to ensure the construction safety of return air shaft in Changping Coal Mine, the construction and support scheme of wellbore in weathered bedrock and bedrock are determined by theoretical analysis, and according to the aquifer passed through the wellbore, It is decided to adopt the comprehensive water prevention and control technology of pre-grouting and post-wall grouting in working face. The height of grouting section is determined by analyzing the position of aquifer, and the grouting quantity is estimated according to the effective diffusion radius of slurry. The amount of pre-grouting is 1758 m 鈮,
本文编号:2477800
[Abstract]:In order to ensure the construction safety of return air shaft in Changping Coal Mine, the construction and support scheme of wellbore in weathered bedrock and bedrock are determined by theoretical analysis, and according to the aquifer passed through the wellbore, It is decided to adopt the comprehensive water prevention and control technology of pre-grouting and post-wall grouting in working face. The height of grouting section is determined by analyzing the position of aquifer, and the grouting quantity is estimated according to the effective diffusion radius of slurry. The amount of pre-grouting is 1758 m 鈮,
本文编号:2477800
本文链接:https://www.wllwen.com/kejilunwen/anquangongcheng/2477800.html