300MW汽轮机高中压转子振动分析诊断及处理
发布时间:2018-07-14 12:23
【摘要】:针对某电厂一台300MW汽轮发电机组进行刷式汽封改造后,机组在启动过程中高中压转子多次因一阶临界转速振动超标,机组无法定速的振动故障,描述和研究了高中压转子振动特性,分析了该机组高中压转子的振动原因,制定了保证高中压转子安全的前提下进行振动磨合的运行方案,在摩擦故障消除后,通过对高中压转子进行现场动平衡,消除了振动故障,保证了机组的安全稳定运行。
[Abstract]:After a 300MW turbine-generator set was retrofitted with brush steam seal in a power plant, during the start-up process of the unit, the vibration failure of the unit could not be fixed because the vibration of the first order critical speed vibration exceeded the standard for many times because of the high and middle pressure rotor. The vibration characteristics of the high pressure rotor are described and studied, the vibration reasons of the high pressure rotor of the unit are analyzed, and the running scheme of vibration running-in under the premise of ensuring the safety of the high pressure rotor is worked out, and the friction fault is eliminated. Through the field dynamic balance of the high pressure rotor, the vibration fault is eliminated and the safe and stable operation of the unit is ensured.
【作者单位】: 黑龙江省电力科学研究院;
【分类号】:TM621.3
本文编号:2121631
[Abstract]:After a 300MW turbine-generator set was retrofitted with brush steam seal in a power plant, during the start-up process of the unit, the vibration failure of the unit could not be fixed because the vibration of the first order critical speed vibration exceeded the standard for many times because of the high and middle pressure rotor. The vibration characteristics of the high pressure rotor are described and studied, the vibration reasons of the high pressure rotor of the unit are analyzed, and the running scheme of vibration running-in under the premise of ensuring the safety of the high pressure rotor is worked out, and the friction fault is eliminated. Through the field dynamic balance of the high pressure rotor, the vibration fault is eliminated and the safe and stable operation of the unit is ensured.
【作者单位】: 黑龙江省电力科学研究院;
【分类号】:TM621.3
【相似文献】
相关期刊论文 前8条
1 王爱林;;高中压转子振动分析和现场动平衡[J];湖南电力;2007年01期
2 张法科;;国产660MW超临界机组高中压转子弯曲处理[J];中国电力;2014年01期
3 马力深;钟约先;马庆贤;袁朝龙;;超(超)临界火电机组高中压转子技术的发展[J];锻压技术;2006年01期
4 王玲;郭祖光;平路光;;汽轮发电机高中压转子振动原因分析[J];电站系统工程;2014年04期
5 黄俊;;300MW汽轮机高中压转子振动突变故障处理[J];电力安全技术;2006年07期
6 张学延,李亚军;300MW机组高中压转子低频振动原因分析及其对策[J];热力发电;1999年06期
7 龙劲强;;国产300 MW汽轮机组高中压转子弯轴事故分析[J];江苏电机工程;2008年04期
8 陈冀平;K-200-130-3型汽轮机高中压转子对轮螺栓裂纹原因分析[J];河北电力技术;1989年01期
相关会议论文 前2条
1 唐建伟;张精桥;;600MW空冷#1机组高中压转子过临界振动问题研究处理[A];第九届电站金属材料学术年会论文集(第二卷)[C];2011年
2 刘建军;;黔北电厂2号机启停和运行过程中振动大的原因分析和处理[A];贵州省电机工程学会2010年优秀论文集[C];2010年
相关硕士学位论文 前1条
1 朱占魁;超超临界高中压转子用1Cr12W2NiMoVNbN洁净钢冶炼技术研究[D];河南科技大学;2014年