核电站人桥吊车提升机构的可靠性分析
发布时间:2019-01-07 17:59
【摘要】:人桥吊车是核电站中燃料搬运的关键设备,提升机构作为人桥吊车的重要执行机构,直接关系到吊运核燃料的安全性。对人桥吊车提升机构的可靠性进行了分析,指出系统中的关键部件,为提升机构设计方案的确定提供依据。
[Abstract]:Human-bridge crane is the key equipment for fuel handling in nuclear power plant. As an important actuating mechanism of man-bridge crane, the lifting mechanism is directly related to the safety of nuclear fuel hoisting. The reliability of the lifting mechanism of the crane is analyzed, and the key components of the system are pointed out, which provides the basis for the determination of the design scheme of the lifting mechanism.
【作者单位】: 上海第一机床厂有限公司;
【分类号】:TM623
本文编号:2403961
[Abstract]:Human-bridge crane is the key equipment for fuel handling in nuclear power plant. As an important actuating mechanism of man-bridge crane, the lifting mechanism is directly related to the safety of nuclear fuel hoisting. The reliability of the lifting mechanism of the crane is analyzed, and the key components of the system are pointed out, which provides the basis for the determination of the design scheme of the lifting mechanism.
【作者单位】: 上海第一机床厂有限公司;
【分类号】:TM623
【相似文献】
相关期刊论文 前2条
1 ;由CCG进行工程设计的超强轻质行人桥建造[J];玻璃钢/复合材料;2014年02期
2 ;[J];;年期
相关重要报纸文章 前1条
1 方栋波邋左起超 杨清刚;孩子别哭,叔叔给你们搭“人桥”[N];人民日报;2008年
,本文编号:2403961
本文链接:https://www.wllwen.com/kejilunwen/dianlidianqilunwen/2403961.html