武川县风力发电项目风险管理研究
[Abstract]:Wind energy is a renewable energy, and clean, environmental protection, in the increasingly tight energy supply environment, the effective use of wind resources will become the fundamental to ease the relationship between energy supply and demand. For our country, the wind power market has achieved relatively rapid progress from the beginning to now. Not only the technical maturity of wind power has been improved, but also the related projects have promoted the promotion of wind power market. For many regions with abundant wind power resources, Making full use of wind power resources and carrying out wind power projects is bound to achieve the healthy development of wind power generation industry. Under the protection of a number of national policies and decrees on wind power projects, many provinces in China that have the ability to develop wind power have begun to develop wind power projects strategically, through the introduction of a model implemented by professional project companies, and technically. Industry access, industry norms, standards, investment have been greatly helped, but the management of wind power projects still face a lot of problems, such as project management is not perfect, project risk is very large. Wuchuan County is an autonomous county of Inner Mongolia Autonomous region in China. After wind power generation has gradually become an important field of new energy development, Wuchuan County focuses on the distribution of wind power generation projects. Among the six wind power projects announced in Inner Mongolia in 2016, Wuchuan county wind power project has become an important member. Therefore, how to control the possible risks and make the project carry out smoothly has become an important part of project management. By studying the wind power project that has been completed in 2011 and summarizing the practice of risk management, this paper excavates the existing risk management dilemma, and provides the optimized countermeasures for the risk management of wind power project in the later stage, so as to start the layout of the wind power project in 2016. A new round of wind power generation projects with a duration of up to 3 years is provided as a reference. Taking wind power generation project in Wuchuan county as an example, this paper discusses the research of risk management, and divides it into six chapters to complete the full text research. The first chapter is the introduction, which focuses on the research background, the theoretical basis and the existing relevant theoretical basis, the second chapter is the theoretical support part of the article. Chapter 3 focuses on the introduction of the basic situation of wind power projects in Wuchuan County, starting with the basic situation of the company, the construction background and the basic situation of the project. Chapter 4 analyzes the current situation of wind power management in Wuchuan County, and analyzes the five risk management processes, including the project management plan, identification, evaluation, response and monitoring of wind power generation in Wuchuan County. Put forward the suggestion of implementing the wind power project risk management from the countermeasure; Chapter 5, based on the previous analysis, analyzes the stage problems and causes of wind power project risk management in Wuchuan County. Chapter 6 is the summary and prospect part.
【学位授予单位】:电子科技大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TM614
【参考文献】
相关期刊论文 前10条
1 彭小东;;风力发电项目建设期的风险管理和风险对策研究[J];云南水力发电;2016年06期
2 黄碧云;;山区风电项目风险管理研究[J];企业技术开发;2015年32期
3 史辉情;;建筑工程项目风险管理研究[J];工程经济;2015年10期
4 崔泽南;;商业地产项目经营管理中的风险管控[J];商场现代化;2015年22期
5 张虹;;基于蒙特卡洛方法对风力发电建设项目投资财务风险分析[J];价值工程;2015年11期
6 宋金涛;;试论风力发电工程项目管理[J];科技创新与应用;2014年22期
7 汤伶俐;李康;;浅谈项目风险管理[J];商场现代化;2014年16期
8 楼文伟;;海上风力发电项目管理中的风险控制[J];当代经济;2014年08期
9 黄跃林;李银;;层次分析法在工程项目风险管理中的应用[J];黑龙江交通科技;2013年04期
10 赵会茹;苏婕;戴杰超;;我国风力发电项目投资风险评价——基于支持向量机模型[J];技术经济;2012年12期
相关博士学位论文 前1条
1 刘珂;可再生能源发电投资风险分析与评估模型[D];华北电力大学;2013年
相关硕士学位论文 前10条
1 陈亮亮;风力发电项目风险评价与控制研究[D];华北电力大学(北京);2016年
2 史先达;阿拉善盟30MW风力发电项目风险管理研究[D];华北电力大学;2016年
3 侯威;风力发电项目的投资风险评价方法研究[D];华北电力大学;2016年
4 姚兴华;临江聚宝风力发电厂建设项目风险管理研究[D];吉林大学;2015年
5 郑春柳;河南泌阳风力发电项目的风险管理[D];上海交通大学;2015年
6 丁文俊;风力发电项目投资风险分析及评价[D];华北电力大学;2014年
7 赵民;安徽天长杨村风力发电项目风险管理研究[D];吉林大学;2013年
8 龚建斌;风力发电风机设备供应商项目管理研究[D];首都经济贸易大学;2013年
9 李银;风力发电场工程施工总承包模式及风险分析[D];浙江大学;2013年
10 赵民;风力发电项目融资的可行性分析及风险研究[D];山东大学;2011年
,本文编号:2404390
本文链接:https://www.wllwen.com/kejilunwen/dianlidianqilunwen/2404390.html