基于物元可拓模型的光伏并网发电项目综合评价研究
[Abstract]:With the rapid development of China's economy, the demand for fossil fuels has increased greatly in enterprises and residents, and the problems of energy shortage and environmental pollution have also followed, thus inhibiting the sustainable and healthy development of social economy. As a non-polluting renewable energy, solar energy is an ideal alternative to fossil fuels. Photovoltaic project is of great significance to the reasonable exploitation and utilization of solar energy resources and to the improvement of the power supply structure of China's power system. This paper mainly focuses on the project of 20 MW PV power station in Shixian. First of all, a lot of domestic and foreign scholars are referred to the research results of photovoltaic projects, and a wide range of relevant information about photovoltaic projects are collected, which lays a solid theoretical foundation and material support for this paper. Combined with the characteristics of the 20 MW PV power station in Shixian County, this paper analyzes the distribution technology, the economic benefits of the PV power station, the social impact of PV grid connection and the sustainable impact of PV power station construction. A total of 14 indexes have been established for the evaluation index system of 20 MW PV power station projects in Shexian County, and these indexes have been analyzed in detail, discussed, and a matter-element extension model based on analytic hierarchy process (AHP) has been put forward. The combined model is used to evaluate the photovoltaic projects in this area, and it is concluded that the construction grade of the 20 MW PV power station in Shixian is "good". According to the results of the evaluation, the implementation of the project is advanced in terms of distribution technology. At the same time, the implementation of the photovoltaic power project will not only bring huge economic benefits to the enterprise, but also promote the local economic development. To promote the development of society, and for environmental protection is a great advantage. Therefore, the project of 20 MW PV power station in the county has high investment in construction. Finally, according to the evaluation results, this paper summarizes some defects of the 20 MW PV power station project in Shixian County, and puts forward some reasonable suggestions to help the project implementation and management.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TM615
【参考文献】
相关期刊论文 前10条
1 杨琳;谭亮;刘洋;;基于模糊综合评价法的光伏发电项目风险评价研究[J];电力学报;2014年05期
2 郭剑;徐剑楠;;分布式光伏并网发电对配电网的影响以及应对调整策略[J];电力需求侧管理;2014年02期
3 丁明;王伟胜;王秀丽;宋云亭;陈得治;孙鸣;;大规模光伏发电对电力系统影响综述[J];中国电机工程学报;2014年01期
4 苏建华;;光伏发电配额制需要解决的几个关键问题[J];华北电力大学学报(社会科学版);2013年06期
5 苏剑;周莉梅;李蕊;;分布式光伏发电并网的成本/效益分析[J];中国电机工程学报;2013年34期
6 金强;史梓男;李敬如;杨露露;;光伏发电项目的国民经济评价[J];电力建设;2013年11期
7 魏毅立;刘明珠;吴振奎;张新;王琼;;太阳能热风发电技术及其应用[J];可再生能源;2013年04期
8 陈炜;艾欣;吴涛;刘辉;;光伏并网发电系统对电网的影响研究综述[J];电力自动化设备;2013年02期
9 孙艳伟;王润;肖黎姗;刘健;余运俊;庄小四;;中国并网光伏发电系统的经济性与环境效益[J];中国人口.资源与环境;2011年04期
10 韩芳;;我国可再生能源发展现状和前景展望[J];可再生能源;2010年04期
相关会议论文 前1条
1 ;美国、欧洲和日本等国家鼓励发展分布式发电[A];《电站信息》2012年第9期[C];2012年
相关硕士学位论文 前7条
1 王瑶法;建设光伏发电站的可行性分析[D];厦门大学;2014年
2 张恒;托克泰光伏发电项目可行性综合评价研究[D];华北电力大学;2014年
3 郝赫;光伏分布式发供电系统设计与研制[D];大连海事大学;2013年
4 顾文石;安白景观带光伏发电项目技术经济分析及综合评价[D];华北电力大学;2013年
5 丁可望;DT公司太阳能光伏发电项目效益研究[D];兰州大学;2013年
6 周颖;光伏并网发电站对配网的影响分析及正负效应综合评估[D];重庆大学;2012年
7 孟忠;太阳能光伏发电项目的后评价及实证研究[D];华北电力大学(北京);2010年