基于EPCM模式的我国光伏分布式能源建设管理研究
发布时间:2018-07-08 18:15
本文选题:分布式光伏发电工程 + EPC ; 参考:《华北电力大学》2014年硕士论文
【摘要】:近年来,我国光伏发电工程建设速度不断加快,从大型地面电站到金太阳项目到分布式光伏发电项目。对于分布式光伏发电项目来说,存在建设用地形式多样,并网点分散,产权分散,投资主体多样等各种与传统电力项目不同的地方。目前国家对分布式光伏发电项目的支持政策陆续出台,国内分布式光伏发电项目将迎来一轮新的增长。国内建设单位在分布式光伏工程项目的过程管理和建设模式上经验匮乏,不少项目还停留在传统火电和地面电站的建设模式上,项目的质量、进度、成本缺乏控制,导致最终上网电量和投资收益不能得到有效保证。 本文在对总承包工程管理Engineering Project Construction Management (EPCM)和总承包工程Engineering Procurement Construction (EPC)模式分析的基础上,根据分布式光伏电站的特点,提出对分布式光伏电站项目采用总承包工程管理(EPCM)模式,结合分布式光伏电站实际建设过程,分别对分布式光伏电站建设过程的组织重组、过程重组和并行管理环境建立等阶段的建设模式进行分析,最后,结合科技部分布式光伏微电网示范项目的实例,对这一管理模式进行论证,以先进的项目管理理论为依据,研究其在分布式光伏发电项目全过程管理中的具体运用和应用效果,以期总结出一套适合分布式光伏发电项目的管理流程和方法,保证分布式光伏电站的建设质量和盈利能力。
[Abstract]:In recent years, the construction of photovoltaic power generation projects in China has been accelerating, from large ground power stations to gold solar projects to distributed photovoltaic power generation projects. For the distributed photovoltaic power generation project, there are many different places from the traditional power projects, such as diversified construction land, scattered network, dispersed property rights, diversified investment subjects, and so on. At present, the national support policies for distributed photovoltaic power generation projects have been issued one after another, and the domestic distributed photovoltaic power generation projects will usher in a new round of growth. Domestic construction units lack of experience in the process management and construction mode of distributed photovoltaic project, many projects still stay in the traditional thermal power and ground power plant construction mode, the quality, progress, cost of the project lack of control, As a result, the final power and investment income can not be effectively guaranteed. Based on the analysis of EPCM and EPC modes, and according to the characteristics of distributed photovoltaic power stations, this paper proposes a general contracting project management (EPCM) model for distributed photovoltaic power plants. Combined with the actual construction process of distributed photovoltaic power station, this paper analyzes the construction modes of the construction process of distributed photovoltaic power station, such as organization reorganization, process reorganization and concurrent management environment establishment, etc. Finally, Combined with the example of distributed photovoltaic microgrid demonstration project of the Ministry of Science and Technology, this management model is demonstrated. Based on the advanced project management theory, the concrete application and application effect in the whole process management of distributed photovoltaic power generation project are studied. In order to sum up a set of management flow and method suitable for distributed photovoltaic power generation project, ensure the construction quality and profitability of distributed photovoltaic power station.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TM615
【引证文献】
相关期刊论文 前1条
1 亢超;;EPC光伏电站工程建设过程的项目管理探讨[J];科技创业月刊;2015年17期
相关博士学位论文 前1条
1 陈文君;政府投资项目代建人信用评价体系与信用管理研究[D];华北电力大学;2013年
,本文编号:2108288
本文链接:https://www.wllwen.com/kejilunwen/dianlilw/2108288.html