多风电场与梯级水电站协调运行对电力系统可靠性的影响
发布时间:2019-05-18 06:05
【摘要】:目前关于多风电场与梯级水电站协调运行对电力系统可靠性影响的研究较少,为此提出了一种评估大规模风电场接入含有梯级水电站的电力系统的可靠性的方法。该方法较准确地建立了风电场、梯级水电站的出力模型,充分考虑了多个风电场之间的相关性和梯级水电站来水径流的不确定性,并建立了基于拉丁超立方采样的序贯蒙特卡罗可靠性模型,可用于评估可再生能源的利用率和系统的长期可靠性。通过将风电-水电协调运行模式下的可靠性与风电、水电独立运行模式下的可靠性进行对比,验证了前者的优越性。最后将上述方法应用于测评西北直调电网中风-水-火协调运行和各自独立运行对系统可靠性的影响,结果表明协调运行可大幅度提高系统的可靠性,同时也验证了所提模型和方法的合理性。
[Abstract]:At present, there is little research on the influence of coordinated operation of multi-wind farms and cascade hydropower stations on the reliability of power system. Therefore, a method to evaluate the reliability of large-scale wind farms connected to power systems with cascade hydropower stations is proposed. The output model of wind farm and cascade hydropower station is established accurately by this method, and the correlation between several wind farms and the uncertainty of incoming water runoff of cascade hydropower station are fully considered. A sequential Monte Carlo reliability model based on Latin hypercubic sampling is established, which can be used to evaluate the utilization rate of renewable energy and the long-term reliability of the system. By comparing the reliability of wind power-hydropower coordinated operation mode with that of wind power and hydropower independent operation mode, the superiority of the former is verified. Finally, the above methods are applied to evaluate the influence of stroke-water-fire coordinated operation and their independent operation on the reliability of the system. The results show that the coordinated operation can greatly improve the reliability of the system. At the same time, the rationality of the proposed model and method is verified.
【作者单位】: 中国电力科学研究院;国网冀北电力有限公司电力科学研究院;
【基金】:国家863高技术基金项目(2011AA05A103) 国家电网公司千人计划专项支持项目(CEPRI:XT71-12-028)~~
【分类号】:TV737;TM614;TM732
[Abstract]:At present, there is little research on the influence of coordinated operation of multi-wind farms and cascade hydropower stations on the reliability of power system. Therefore, a method to evaluate the reliability of large-scale wind farms connected to power systems with cascade hydropower stations is proposed. The output model of wind farm and cascade hydropower station is established accurately by this method, and the correlation between several wind farms and the uncertainty of incoming water runoff of cascade hydropower station are fully considered. A sequential Monte Carlo reliability model based on Latin hypercubic sampling is established, which can be used to evaluate the utilization rate of renewable energy and the long-term reliability of the system. By comparing the reliability of wind power-hydropower coordinated operation mode with that of wind power and hydropower independent operation mode, the superiority of the former is verified. Finally, the above methods are applied to evaluate the influence of stroke-water-fire coordinated operation and their independent operation on the reliability of the system. The results show that the coordinated operation can greatly improve the reliability of the system. At the same time, the rationality of the proposed model and method is verified.
【作者单位】: 中国电力科学研究院;国网冀北电力有限公司电力科学研究院;
【基金】:国家863高技术基金项目(2011AA05A103) 国家电网公司千人计划专项支持项目(CEPRI:XT71-12-028)~~
【分类号】:TV737;TM614;TM732
【参考文献】
相关期刊论文 前10条
1 吴义纯,丁明,李生虎;风电场对发输电系统可靠性影响的评估[J];电工技术学报;2004年11期
2 于晗;钟志勇;黄杰波;张建华;;采用拉丁超立方采样的电力系统概率潮流计算方法[J];电力系统自动化;2009年21期
3 丁明,张静,李生虎;基于序贯蒙特卡罗仿真的配电网可靠性评估模型[J];电网技术;2004年03期
4 衣立东;朱敏奕;魏磊;姜宁;于广亮;;风电并网后西北电网调峰能力的计算方法[J];电网技术;2010年02期
5 秦志龙;李文沅;熊小伏;;考虑风速相关性的发输电系统可靠性评估[J];电力系统自动化;2013年16期
6 曲,