蓬莱市北沟污水处理厂二期工程设计
发布时间:2018-04-10 18:34
本文选题:印染废水 + 染料中间体废水 ; 参考:《中国给水排水》2016年14期
【摘要】:北沟污水处理厂二期工程设计规模为1.0×10~4m~3/d,其进水中70%为印染、染料中间体及化工废水。设计采用以预处理+PAC多模式A~2/O+深度处理为主体的工艺。从2015年1月一12月的运行数据来看,该工艺处理效果较好,运行稳定,实际出水水质优于设计值(一级A排放标准)。详细介绍了各单元的设计参数,并通过对运行数据进行分析,总结了设计、运行经验。
[Abstract]:The design scale of the second phase project of Beigou sewage treatment Plant is 1.0 脳 10 ~ (4) m ~ (-1) / d, and 70% of the influent is printing and dyeing, dyestuff intermediate and chemical wastewater.The process of preprocessing PAC multimode A2 / O advanced treatment was adopted.According to the operation data from January to December, 2015, the process has good treatment effect, stable operation, and the actual effluent quality is better than the design value (first class A discharge standard).The design parameters of each unit are introduced in detail, and the design and operation experience are summarized by analyzing the running data.
【作者单位】: 山东省环科院环境工程有限公司;
【分类号】:X703
【相似文献】
相关期刊论文 前3条
1 刘晓军;秦桂海;张学杨;张志斌;;烟台市辛安河污水厂二期工程设计[J];科技信息(科学教研);2008年25期
2 刘晓军;秦桂海;张学杨;张志斌;;烟台市辛安河污水厂二期工程设计[J];水科学与工程技术;2008年S2期
3 ;[J];;年期
相关硕士学位论文 前1条
1 刘国强;某市市区污水管网改扩建二期工程设计与研究[D];长安大学;2011年
,本文编号:1732407
本文链接:https://www.wllwen.com/kejilunwen/huanjinggongchenglunwen/1732407.html