当前位置:主页 > 科技论文 > 环境工程论文 >

开封东区污水处理厂升级改造

发布时间:2018-05-29 08:17

  本文选题:AAO工艺 + 升级改造 ; 参考:《中国给水排水》2016年16期


【摘要】:开封东区污水处理厂于2015年完成升级改造,工程设计规模为15×10~4m~3/d,采用分段进水、两点污泥回流式AAO工艺,并增设侧向流斜板沉淀/纤维转盘滤池深度处理设施,出水水质由《城镇污水处理厂污染物排放标准》(GB 18918—2002)的一级B标准提升至一级A标准。分析了该升级改造工程的技术难点,介绍了工艺流程、设计参数、运行情况等。
[Abstract]:Kaifeng Eastern sewage treatment Plant was upgraded in 2015. The design scale of the project was 15 脳 10 ~ 4 mm ~ 3 / d. The process of two-point sludge reflux AAO process was adopted, and an advanced treatment facility for lateral flow inclined plate sedimentation / fiber rotary plate filter was added. The effluent quality was upgraded from Grade B to Grade A of the pollutants discharge Standard of the Municipal sewage treatment Plant (GB 18918-2002). The technical difficulties of the upgrading project are analyzed, and the technological process, design parameters and operation conditions are introduced.
【作者单位】: 浦华环保有限公司;天津市市政工程设计研究院;
【分类号】:X703.1

【参考文献】

相关期刊论文 前2条

1 王佳伟;郑江;周军;陈刚新;甘一萍;杨向平;;基于碳源需求的A~2/O工艺分段进水研究[J];中国给水排水;2010年11期

2 吕擰;赵永志;王佳伟;周军;王洪臣;张成惠;张莉;;初沉污泥水解酸化对A~2/O工艺强化除磷影响[J];北京工业大学学报;2008年09期

【共引文献】

相关期刊论文 前10条

1 马宁;汪浩;刘操;侯达;骆虎;韩旭;杨兰琴;;污水厂提标改造中A~2/O工艺研究与应用趋势[J];中国给水排水;2016年20期

2 周丽颖;仲崇川;张云霞;张z,

本文编号:1950168


资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/huanjinggongchenglunwen/1950168.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户e2d64***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com