高速公路改扩建项目业主风险识别与控制
发布时间:2018-01-23 03:01
本文关键词: 项目管理 风险管理 改扩建 风险识别 风险控制 出处:《长安大学》2014年硕士论文 论文类型:学位论文
【摘要】:改革开放以来,我国在公路建设方面取得了突飞猛进的发展,伴随着经济的发展、民众生活水平的提高、交通物流业的迅猛崛起,我国的公路特别是高速公路,出现了严重饱和的现象,,高速公路改扩建已提上日程。由于高速公路项目自身的特点,在改扩建项目实施过程中,各个主体都面临着一定的风险。 本文主要研究高速公路改扩建项目实施过程中,业主面临的风险,以及如何应对这些风险,从而减少风险。 本文首先分析了高速公路改扩建项目风险产生的原因、规避机制,论述了业主、承包商、施工企业在高速公路改扩建项目实施过程中可能面临的风险,接着详细分析了改扩建项目实施进程中风险识别的原则、特点,风险识别内容以及依据,介绍了风险识别的相关方法以及主要程序。 接着对高速公路改扩建项目实施过程中风险管理、风险控制的相关方法进行了介绍,最后结合赛(赛里木湖)-果(果子沟口)高速公路改扩建项目自身的特点,论述了在高速公路改扩建项目中,业主在风险管理方面中进行的风险识别:工程建设风险、管理风险、质量风险,针对这些风险,业主采取风险回避、风险转移、风险缓解、风险监控、风险自留等有效的措施来应对这些风险,通过上述这些措施,成功应对了一些具有较大安全隐患的风险,保证了项目的顺利实施。
[Abstract]:Since the reform and opening up, China has made rapid progress in highway construction, with the economic development, the improvement of people's living standards, the rapid rise of the transportation logistics industry, China's highways, especially highways. Due to the characteristics of the expressway project, each subject is faced with certain risks in the process of implementation of the project. This paper mainly studies the risks faced by the owners during the implementation of the expressway reconstruction and extension project and how to deal with these risks so as to reduce the risks. This paper first analyzes the causes of the expressway reconstruction and extension project risk, the avoidance mechanism, discusses the owner, contractors, construction enterprises in the expressway reconstruction and expansion project implementation process may face the risks. Then, the principles, characteristics, contents and basis of risk identification in the process of implementing the reconstruction and extension project are analyzed in detail, and the related methods and main procedures of risk identification are introduced. Then it introduces the risk management and risk control methods in the implementation of expressway reconstruction and extension project. Finally, combined with the characteristics of the project of Expressway reconstruction and extension, the paper discusses the project of Expressway Reconstruction and extension. Owners in the risk management of risk identification: construction risks, management risks, quality risks, in view of these risks, owners take risk avoidance, risk transfer, risk mitigation, risk monitoring. Risk retention and other effective measures to deal with these risks, through these measures, successfully deal with some of the risks with greater security risks, to ensure the smooth implementation of the project.
【学位授予单位】:长安大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:U415.1
【参考文献】
相关期刊论文 前10条
1 孙建华;;建设项目风险识别研究[J];重庆科技学院学报(自然科学版);2010年03期
2 王鹏;工程项目风险管理理论的演进[J];西北工业大学学报(社会科学版);2004年04期
3 龚明华;宋彤;;关于系统性风险识别方法的研究[J];国际金融研究;2010年05期
4 张凤毛;公路建设项目的模糊综合评价[J];公路;1998年10期
5 朱定勤;;高速公路项目管理模式评价[J];公路;2006年05期
6 杨廷钟;;公路工程风险管理系统[J];华东公路;1992年04期
7 华雪峰;公路工程项目风险管理的初步探讨[J];黑龙江交通科技;2005年11期
8 肖维品,欧文平,欧阳安;工程建设项目投资风险分析的实用方法[J];重庆建筑大学学报;1997年06期
9 冯宁;;公路工程项目风险管理后评价[J];交通企业管理;2008年03期
10 郭海荣;公路工程项目风险管理初探[J];山西建筑;2003年15期
本文编号:1456511
本文链接:https://www.wllwen.com/kejilunwen/jiaotonggongchenglunwen/1456511.html